FIELD: oil and gas industry.
SUBSTANCE: automatic process control system of the gas field in real time monitors value of the operation efficiency factor of the gas gathering line E as per passport parameters of the line, data of its operation and monitored process parameters. If E value is beyond the permitted limits, then one can say that: standard operation mode of wells and line are breached (line additionally to gas contains other factor exceeding the permitted rate: gas hydrate, formation water, mechanical admixtures).
EFFECT: method ensures prompt determination of the possibility of the gas gathering line fault.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ON-LINE MONITORING OF WATER AND SAND CARRY-OVER WITH PRODUCT EXTRACTED FROM WELL IN APCS OF GAS-FIELD SITES OF OIL AND GAS CONDENSATE DEPOSITS OF FAR NORTH | 2015 |
|
RU2619602C1 |
METHOD FOR REMOVING WELLS INTERDRIVING IN GAS COLLECTING FLOWLINES OF HIGH NORTH GAS FIELDS | 2016 |
|
RU2630323C1 |
METHOD FOR DETERMINING HEAT TRANSFER COEFFICIENT OF GAS IN GAS-COLLECTING TRAIN TO ATMOSPHERE IN AUTOMATED PROCESS CONTROL SYSTEMS OF COMPLEX GAS TREATMENT PLANTS OF GAS-CONDENSATE DEPOSITS OF FAR NORTH | 2011 |
|
RU2474753C2 |
METHOD OF ON-LINE MONITORING OF WATER AND SAND CARRY-OVER WITH EXTRACTED PRODUCT FROM WELL IN APCS OF GAS-FIELD SITES OF OIL AND GAS CONDENSATE DEPOSITS OF FAR NORTH | 2011 |
|
RU2474685C2 |
METHOD OF RATIONAL BACK ALLOCATION OF GAS BY WELLS ON THE LOCUST OF OIL AND GAS CONDENSATE DEPOSITS OF THE EXTREME NORTH | 2016 |
|
RU2644433C2 |
METHOD OF REDUCING FUEL GAS CONSUMPTION BY PARALLEL OPERATING GAS COMPRESSOR UNITS OF BOOSTER COMPRESSOR STATION | 2023 |
|
RU2819129C1 |
METHOD FOR AUTOMATIC LOAD DISTRIBUTION BETWEEN GAS DRYING PROCESS LINES AT GAS TREATMENT PLANTS LOCATED IN THE NORTH OF RUSSIA | 2019 |
|
RU2724756C1 |
METHOD FOR REAL-TIME MONITORING OF WATER AND SAND CARRY-OVER WITH EXTRACTED PRODUCT FROM WELL IN AUTOMATED PROCESS CONTROL SYSTEMS OF GAS-FIELD OBJECTS OF OIL AND GAS CONDENSATE OF DEPOSITS OF FAR NORTH | 2015 |
|
RU2608141C1 |
METHOD FOR DETERMINING HYDRAULIC RESISTANCE COEFFICIENT IN GAS WELL BORE | 2016 |
|
RU2626098C1 |
METHOD FOR AUTOMATIC LOAD DISTRIBUTION BETWEEN GAS DRYING TRAINS AT COMPLEX GAS TREATMENT PLANTS | 2023 |
|
RU2805067C1 |
Authors
Dates
2015-11-20—Published
2014-08-05—Filed