FIELD: oil and gas industry.
SUBSTANCE: device for operation of a formation with zones of different permeability includes a horizontal area of a production well equipped with a filter. The filter is made in the form of pipe installed outside of coaxially opened casing pipe with a gap that is divided by transverse bridges into the sections. Gaps in some sections are provided with water-swelling material. The water-swelling material is made in the form of a sleeve installed above the casing pipe opening and sealing filter in the corresponding section from the inside. The sections are made alternating with the sections communicated with them without the water-swelling sleeve. The water-swelling sleeve is made with the ability to overlap the casing pipe opening in case of watering of the extracted products above the process defined rate. The casing pipe has an inner valve that lets inside.
EFFECT: design of the device for exploitation of the formation with zones of different permeability allows to reliably cover the zone when the produced product is watered above the process defined rate, and also to eliminate the effect of the watered product from downstream zones on the swelling sleeve of upper zones and their premature overlap.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF MULTILAYER NON-HOMOGENEOUS OIL DEPOSIT | 2011 |
|
RU2459934C1 |
METHOD OF COMPLETION OF HORIZONTAL PRODUCTION WELL CONSTRUCTION WITH DEPOSIT INTERVAL HYDRAULIC FRACTURING | 2014 |
|
RU2564316C1 |
METHOD AND DEVICE FOR DEVELOPMENT OF HEAVY OIL OR BITUMEN DEPOSIT BY USING TWO-HEAD HORIZONTAL WELLS | 2009 |
|
RU2410534C1 |
DEVELOPMENT METHOD BY HORIZONTAL WELL OF FORMATION WITH ZONES OF VARIOUS PERMEABILITY | 2011 |
|
RU2485290C1 |
DEVELOPMENT OF INHOMOGENEOUS DEPOSIT BY INCLINED AND HORIZONTAL WELLS | 2013 |
|
RU2524800C1 |
METHOD OF FITTING WELL FILTER IN HORIZONTAL WELL | 2012 |
|
RU2514040C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT OF HEAVY OIL OR BITUMEN WITH CONTROL OVER WITHDRAWAL OF WELL PRODUCTION | 2009 |
|
RU2414593C1 |
METHOD FOR CONSTRUCTION OF MULTI-BARREL WELL | 2020 |
|
RU2742087C1 |
METHOD AND DEVICE FOR RESEARCH AND OPERATION OF HORIZONTAL WELL WITH ZONES OF PERMEABILITY VARIATIONS | 2017 |
|
RU2653216C1 |
MINING METHOD FOR MULTI-LAYERED INHOMOGENEOUS OIL RESERVOIR | 2016 |
|
RU2626492C1 |
Authors
Dates
2017-09-11—Published
2016-06-15—Filed