FIELD: measuring equipment.
SUBSTANCE: method for partial discharges measurement consists of high voltage application to the test object and temporary fixation of the signal from the sensor, its filtration and recording. At that, a similar recording of the signal is repeated with the object switched off and the second signal is subtracted from the first signal for a similar period of time. The result obtained is used to evaluate the state of electrical equipment. Additionally, the applied test voltage is synchronized with the mains voltage.
EFFECT: improved measurement accuracy by reducing interference.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MEASUREMENT OF PARTIAL DISCHARGE | 2017 |
|
RU2650345C1 |
METHOD FOR START-UP OF PERCUSSION ELECTRIC GENERATOR OF TEST BENCH | 2019 |
|
RU2705915C1 |
APPARATUS FOR MEASURING PARTIAL DISCHARGES | 2020 |
|
RU2758393C1 |
METHOD FOR TESTING TRANSFORMERS AND REACTORS | 2020 |
|
RU2763033C1 |
APPARATUS FOR TESTING TRANSFORMERS (VERSIONS) | 2019 |
|
RU2710778C1 |
DEVICE FOR PROTECTION OF VACUUM-SWITCHED EQUIPMENT FROM OVERVOLTAGE | 2019 |
|
RU2706637C1 |
HIGH-VOLTAGE SUBSTATION | 2019 |
|
RU2710357C1 |
METHOD FOR AUTOMATIC FAST-RESPONSE ON-OPERATION | 2003 |
|
RU2252473C1 |
DEVICE FOR CONTROL OF TWO MAGNETIZED REACTORS (VERSIONS) | 2018 |
|
RU2699017C1 |
FREQUENCY CONVERTER CONTROL METHOD | 2017 |
|
RU2660809C1 |
Authors
Dates
2017-12-21—Published
2017-04-20—Filed