FIELD: construction.
SUBSTANCE: framework is erected from a plurality of trusses. Initially, each truss is pre-assembled from ready elements in the horizontal position either on the foundation or on the installation site. Thereinafter, the truss assembled in that way is horizontally moved along the foundation surface up to the alignment of the truss base with the previously formed conditional line of its design position on the foundation. Then, by means of turning the truss, the truss is moved from the horizontal position to the vertical design position. The trusses fixed in that way are fixed in their design positions to form the desired framework.
EFFECT: simplifying the framework erection technology.
12 dwg
Title | Year | Author | Number |
---|---|---|---|
MODULAR FOLDING FRAMEWORK OF BUILDING | 2016 |
|
RU2632831C1 |
MULTI-PURPOSE BUILDING | 2007 |
|
RU2345200C2 |
CONSTRUCTION METHOD | 2019 |
|
RU2706288C1 |
CONSTRUCTION OF RESIDENTIAL BUILDING OF SECONDARY DEVELOPMENT | 1999 |
|
RU2174579C2 |
METHOD OF RECONSTRUCTING INDUSTRIAL BUILDING FRAMEWORK INCREASING LOAD LIFTING CAPACITY OF CRANE EQUIPMENT | 0 |
|
SU1574770A1 |
MULTI-PURPOSE CONSTRUCTION FACILITY INCLUDING SEAQUARIUM AND GROUP OF SHOPPING AND ENTERTAINMENT FACILITIES | 2007 |
|
RU2347050C2 |
METHOD OF ADDING STORIES TO BUILDINGS AT RECONSTRUCTION | 1997 |
|
RU2116417C1 |
METHOD FOR CONSTRUCTING BUILDING ADDITION | 2010 |
|
RU2442868C1 |
ONE-STOREYED BUILDING | 0 |
|
SU1663159A1 |
METHOD FOR ERECTING BUILDINGS | 0 |
|
SU1126678A1 |
Authors
Dates
2018-01-22—Published
2016-09-30—Filed