FIELD: construction.
SUBSTANCE: method for fixing the slope with geocell geosynthetic material includes a layer of geotextile material laid down on the prepared slope surface. The geocell geosynthetic material consisting of perforated geobands, fixed by metal anchors on the slope surface, and fixed at the base with a concrete stop is laid on top of the geotextile material. A sheet of geotextile material laid on the surface of the slope is treated with a layer of a hydrophobic polymer-soil mixture. The space of cells of the geocell geosynthetic material is filled with a sand-gravel mixture along the entire height of the slope and subjected to polymer impregnation. A layer of soil impregnated with a liquid polymer is applied to the surface of the geocell geosynthetic material.
EFFECT: increasing the static stability of the slope, protecting against various environmental influences, increasing the hydrophobic properties of the structure while providing strength, integrity and durability.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO STRENGTHEN SLOPE WITH GEOCELLULAR GEOSYNTHETIC MATERIAL | 2013 |
|
RU2525405C1 |
COAST-PROTECTING AND ANTI-FILTRATION COATING | 2017 |
|
RU2644952C1 |
METHOD FOR INCREASING THE STABILITY OF THE SLOPES OF EARTH DAMS OF A PROCESS SUMP | 2020 |
|
RU2766993C1 |
LIGHT WEIGHT FLOOD RELIEF WATER DISPOSAL UNIT FOR GROUND WATER DAM | 2017 |
|
RU2668092C1 |
METHOD FOR REPAIR OF CONCRETE CHANNEL LININGS | 2021 |
|
RU2779173C1 |
REINFORCING EARTHWORK DECLIVITIES | 0 |
|
SU1740554A1 |
CULVERT STRUCTURE IN REINFORCED GROUND CASE | 2004 |
|
RU2280124C1 |
METHOD FOR RECLAMATION OF SALT TAILINGS PILE | 2017 |
|
RU2654102C1 |
CONCRETE-FILM COAT FOR SLOPES OF HYDRAULIC STRUCTURES | 0 |
|
SU1138448A1 |
METHOD OF CONSOLIDATION OF CONES OF BRIDGES AND/OR OVERPASSES | 2000 |
|
RU2182200C1 |
Authors
Dates
2018-02-01—Published
2016-06-14—Filed