FIELD: construction.
SUBSTANCE: invention relates to construction, namely to the area of mountain tunnels re-building. Re-building of destroyed section of the mountain road tunnel is carried out by the way of opening the destroyed part of the tunnel into excavation. Temporary tunnel casing of the restored section has the form of an arch, which is made from metal corrugated structures, and its delivery and installation in mounted form to the foundation inside the tunnel are made from above with a helicopter.
EFFECT: technical effect: reducing the labor intensity and timing of the re-building work inside the tunnel.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
SUPPORT UNIT FOR BUILDINGS FROM METALLIC CORRUGATED STRUCTURES | 2016 |
|
RU2633019C1 |
METHOD FOR BEAM BRIDGE RECONSTRUCTION | 2005 |
|
RU2302491C1 |
METHOD FOR ERECTION OF VEHICULAR TRAFFIC TUNNEL OF URBAN RING HIGHWAY OF MEGAPOLIS | 1999 |
|
RU2152473C1 |
METHOD FOR ERECTING INTRA-CITY CIRCULAR MOTORWAY | 1999 |
|
RU2175367C2 |
METHOD FOR ERECTION OF URBAN RING HIGHWAY SECTION MEGAPOLIS | 1999 |
|
RU2152470C1 |
METHOD OF CONSTRUCTION AND PROTECTION OF THE PIPELINE FROM ROCKFALL ON SLOPES IN MOUNTAINOUS AREAS | 2015 |
|
RU2644659C2 |
MINERAL DEPOSIT UPLAND PART EXPLOITATION METHOD | 1993 |
|
RU2038479C1 |
COMPLEX FOR TUNNEL EXCAVATION IN WEAK GROUND | 2006 |
|
RU2302529C1 |
0 |
|
SU54292A1 | |
METHOD FOR SHIELD DRIVING OF TUNNEL | 2008 |
|
RU2383738C2 |
Authors
Dates
2018-03-06—Published
2017-01-23—Filed