INTEGRATED WELL SURVEY MANAGEMENT AND PLANNING TOOL Russian patent published in 2018 - IPC E21B44/00 E21B47/22 G06F19/00 

Abstract RU 2648782 C2

FIELD: mining.

SUBSTANCE: invention relates to an integrated well survey management and planning tool. Tool can receive a trajectory of a proposed well from a surface to a subterranean geological target, to be reached by drilling the well, and a survey plan indicating the number, position and survey type of surveys, to be performed on the well while drilling the well. Tool can apply multiple error models based on the survey types for drilling the well. Each error model defines a respective uncertainty in reaching the subterranean geological target by drilling the well along the received trajectory. Tool can display, in a user interface, the received trajectory of the well and an uncertainty indicator determined by applying the multiple error models. Uncertainty indicator represents a combination of respective uncertainties defined by the multiple error models and indicates an uncertainty in drilling the well on the received trajectory.

EFFECT: complex integrated well survey management and planning tool is proposed, which is implemented using a computer system.

19 cl, 5 dwg

Similar patents RU2648782C2

Title Year Author Number
INTEGRATED DEVICE FOR WELL SURVEY CONTROL AND DRILLING PLANNING 2013
  • Dirksen Ronald Jokhannes
RU2620691C1
BOREHOLE PLANNING USING A GEOMECHANICAL SHIFT 2020
  • Yan, Gong Rui
  • Bao, Zhenning
  • Liu, Qing
  • Yan, Bei
RU2779040C1
SYSTEM AND PROCEDURE FOR DRILLING OPERATION AT DEPOSIT 2008
  • Nikolakis-Mukhas Khristos
  • Singkh Vivek
  • Repin Dmitrij
  • Chehpman Klinton
RU2436947C2
DRILLING METHOD AND SYSTEM WITH AUTOMATED WAYPOINT OR BOREHOLE PATH UPDATES BASED ON SURVEY DATA CORRECTIONS 2014
  • Dirksen Ronald Jokhannes
  • Mitchell Ajan Devid Kempbell
  • Gosni Dzhon Troj
RU2657033C2
SYSTEM AND METHOD OF DRILLING AT OIL DEPOSITS 2008
  • Repin Dmitrij Gennad'Evich
  • Singkh Vivek
  • Chehpman Klinton
  • Brehnnigan Dzhim
RU2452855C2
CONTROL OF WELLBORE DRILLING COMPLEXES 2013
  • Syue Yujchzhen
  • Dikstra Dzhejson D.
RU2640607C1
SYSTEM AND METHOD FOR PERFORMING OPERATIONS FOR STIMULATION OF RESOURCES 2013
  • Kress Olga
  • Ven Syaovej
  • Gu Khunzhen
RU2591857C1
ANALYSIS OF STRATIGRAPHIC INVESTIGATION OF JOINTS 2013
  • Uillyams Kennet E.
  • Ma Tszyanfu
  • Lin Evi
RU2599914C1
METHOD AND SYSTEM FOR CONDUCTING GEOLOGIC BASIN ANALYSIS 2010
  • Perlmatter Martin A.
  • Stichtenot Krejg V.
  • Tran Ankhkit
  • Nel'Son Kennet Dzh.
RU2491579C2
PREDICTING PROPERTIES OF UNDERGROUND FORMATION 2008
  • Priezzhev Ivan Ivanovich
  • Shmar'Jan Leonid Evgen'Evich
  • Bejarano Gaston
RU2462755C2

RU 2 648 782 C2

Authors

Dirksen Ronald Jokhannes

Dates

2018-03-28Published

2013-10-08Filed