INTEGRATED DEVICE FOR WELL SURVEY CONTROL AND DRILLING PLANNING Russian patent published in 2017 - IPC E21B47/22 G01C7/06 

Abstract RU 2620691 C1

FIELD: mining.

SUBSTANCE: offered by computer implemented method of well survey, including: receipt of the well survey results, describing wells drilled from the surface to the subterranean target. At that the well is correlated with the target path, along which the drilling should be done from the surface to the subterranean target. The method further comprises the steps, at which the following is carried out: calculating of uncertainty indicator, designated the uncertainty in well drilling at the target trajectory, based at least partly on the results of well survey and on the target trajectory; and a visual display of the uncertainty indicator in the user interface, so that the factors of well survey, affecting the uncertainty indicator and thus the uncertainty at well drilling.

EFFECT: invention provides the control of the various factors influence on the accuracy of well survey and well drilling plan.

20 cl, 5 dwg

Similar patents RU2620691C1

Title Year Author Number
INTEGRATED WELL SURVEY MANAGEMENT AND PLANNING TOOL 2013
  • Dirksen Ronald Jokhannes
RU2648782C2
DRILLING METHOD AND SYSTEM WITH AUTOMATED WAYPOINT OR BOREHOLE PATH UPDATES BASED ON SURVEY DATA CORRECTIONS 2014
  • Dirksen Ronald Jokhannes
  • Mitchell Ajan Devid Kempbell
  • Gosni Dzhon Troj
RU2657033C2
METHOD AND SYSTEM OF DIRECTIONAL DRILLING USING CONTOURS OF MULTIPLE FEEDBACK 2014
  • Dikstra Dzhejson D.
  • Syue Yujchzhen
  • Bu Fanpin
RU2669414C1
SYSTEM AND PROCEDURE FOR DRILLING OPERATION AT DEPOSIT 2008
  • Nikolakis-Mukhas Khristos
  • Singkh Vivek
  • Repin Dmitrij
  • Chehpman Klinton
RU2436947C2
METHOD AND SYSTEM FOR COMBINED TRACKING OF A WELL DRILLING PROCESS 2018
  • Stishenko Sergej Igorevich
  • Petrakov Yurij Anatolevich
  • Sobolev Aleksej Evgenevich
RU2687668C1
METHOD FOR COMBINING A MODEL OF GEOLOGICAL WELL PASSING WITH OPERATIONAL PETROPHYSICAL INTERPRETATION OF GIS DATA IN REAL TIME AND A SYSTEM IMPLEMENTING THE METHOD 2020
  • Tatur Olga Aleksandrovna
  • Stishenko Sergei Igorevich
  • Sobolev Aleksei Evgenevich
  • Petrakov Iurii Anatolevich
RU2745152C1
BOREHOLE PLANNING USING A GEOMECHANICAL SHIFT 2020
  • Yan, Gong Rui
  • Bao, Zhenning
  • Liu, Qing
  • Yan, Bei
RU2779040C1
CONTROL OF WELLBORE DRILLING COMPLEXES 2013
  • Syue Yujchzhen
  • Dikstra Dzhejson D.
RU2640607C1
METHOD AND SYSTEM FOR PLANNING AND/OR DRILLING OF BOREHOLES 2012
  • Sehmjuehl' Robello
  • Zhermen Oliv'E R.
  • Reddi Umesh N.
  • Kolvin R. Daniehl'
  • Chada Ramakrishna R.
RU2573666C9
METHOD AND SYSTEM FOR CONDUCTING GEOLOGIC BASIN ANALYSIS 2010
  • Perlmatter Martin A.
  • Stichtenot Krejg V.
  • Tran Ankhkit
  • Nel'Son Kennet Dzh.
RU2491579C2

RU 2 620 691 C1

Authors

Dirksen Ronald Jokhannes

Dates

2017-05-29Published

2013-10-08Filed