FIELD: machine building.
SUBSTANCE: present invention relates to transport plant (1) with a large angle of elevation for positioning on ledge (10) of an open pit having track (14) located on ledge (10), along which first (15) and second (16) transport skips (16) transporting minerals (11) can move between deeply located loading station (12) and highly located unloading station (13). Transport skips (15, 16) have unloading hatch (17) for unloading minerals (11), which is located movably between the open position and the closed position. According to the invention, there is carriage feeder (18) provided, which can be moved from the outside with respect to unloading hatch (17), and by means of which unloading hatch (17) can be controlled to move between the closed position and the open position.
EFFECT: shock unloading of minerals from the transport skips is excluded, wear of the closing mechanism for the unloading hatch decreases.
12 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
CONVEYOR PLANT FOR OPEN DEVELOPMENT | 2016 |
|
RU2696894C2 |
UNIT FOR HYDRAULIC LIFTING OF CARGOES IN CONTAINERS | 0 |
|
SU829520A1 |
LIFT-TYPE HYDRAULIC TRANSPORT INSTALLATION | 0 |
|
SU992360A1 |
METHOD FOR INDUSTRIAL WASTE TRANSPORTATION IN UNDERGROUND MINES | 2006 |
|
RU2303133C1 |
METHOD FOR THE DEVELOPMENT OF SOLID MINERAL DEPOSITS | 2020 |
|
RU2748875C1 |
LOADING MACHINE (MODIFICATIONS) | 2006 |
|
RU2304756C1 |
METHOD FOR OPEN EXTRACTION OF MINERAL RESOURCES DEPOSITS | 2003 |
|
RU2249698C1 |
SKIP UNLOADING DEVICE | 1999 |
|
RU2181689C2 |
MINE HOIST | 0 |
|
SU1791318A1 |
STEEP INCLINE CONVEYOR UNIT FOR OPEN WORKING | 2013 |
|
RU2636634C2 |
Authors
Dates
2018-04-11—Published
2014-05-22—Filed