FIELD: information technology.
SUBSTANCE: invention relates to device for estimating the costs of complex technical system (CTS) manufacturing under incomplete information about the planned conceptual design. Device contains two memory blocks, module for input and storage of initial data, averaging block, approximation block, full adder, visualization block, unit for calculating functional dependencies by technique of least squares (TLS) for each generation and unit for calculating the cost of CTS manufacturing, included in the data entry and CTS forecasting module.
EFFECT: technical result consists in automating the cost estimate for manufacturing complex technical system.
1 cl, 1 dwg, 3 tbl
Title | Year | Author | Number |
---|---|---|---|
APPARATUS FOR ESTIMATING COSTS FOR MANUFACTURING A COMPLEX ENGINEERING SYSTEM BASED ON CHANGES IN VOLUME OF AN ANNUAL BATCH | 2018 |
|
RU2737131C2 |
METHOD OF LOAD DISTRIBUTION BETWEEN GAS PRODUCTION COMPLEX GAS DRIER SHOP PROCESS LINES | 2011 |
|
RU2497574C2 |
DIGITAL CORRELATOR | 2020 |
|
RU2735488C1 |
SYSTEM AND METHOD FOR MANAGING CREDIT PORTFOLIOS | 2010 |
|
RU2469401C2 |
METHOD OF AIRCRAFT ENGINES CREATION | 2017 |
|
RU2726958C2 |
METHOD OF IN-TUBE DIAGNOSTICS OF TUBE WALL DEFECT DEPTH | 2009 |
|
RU2444675C2 |
METHOD FOR PREDICTION OF DEVELOPMENT OF OBSTRUCTIVE COMPLICATIONS FOLLOWING ENDOPLASTY OF URETERAL ORIFICE IN CHILDREN USING VOLUME-FORMING SUBSTANCES | 2020 |
|
RU2737493C1 |
SYSTEM TO CONTROL POWER CONSUMPTION OF INDUSTRIAL ENTERPRISES AND PRODUCTION FACILITIES | 2012 |
|
RU2503015C2 |
AUTOMATED SYSTEM FOR MODELLING CHANGES IN INFORMATION SPACE CONTENT | 2019 |
|
RU2717903C1 |
METHOD AND APPARATUS FOR PREDICTING NONSTATIONARY TIME SERIES | 2009 |
|
RU2467383C2 |
Authors
Dates
2018-09-06—Published
2017-01-19—Filed