FIELD: construction.
SUBSTANCE: invention relates to the construction of pipeline crossings through natural and artificial obstacles by directed drilling in loose soils. According to the method, the wellbore zone is treated with a drilling fluid at a dynamic shear stress of at least 300 dPa and a plasticity coefficient of at least 800 s-1. Ratio of the particle size of the drilling mud to the diameter of the permeable channel is at least 6.
EFFECT: increase in the strength of the borehole wall, necessary for dragging the pipeline in the zone of occurrence of unconsolidated soils.
1 cl, 3 tbl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DRILLING MUD FOR CONSTRUCTION OF WELLS IN UNSTABLE CLAY AND NON-CEMENTED SOILS AND METHOD FOR PRODUCTION THEREOF | 2017 |
|
RU2704658C2 |
DRILLING MUD FOR CONSTRUCTION OF UNDERWATER PIPELINE CROSSINGS BY MEANS OF DIRECTIONAL DRILLING METHOD | 2019 |
|
RU2730145C1 |
METHOD FOR CONSTRUCTION AND OPERATION OF COMPLEX OF GROUND STORES FOR COLLECTION OF DRILLING WASTE AND BRINE FLUID | 1998 |
|
RU2138612C1 |
METHOD OF PROTECTION OF KARST OCCURRENCE | 2013 |
|
RU2543162C1 |
INHIBITING DRILLING FLUID FOR DRILLING IN UNSTEADY TERRIGENOUS DEPOSITS | 2020 |
|
RU2755108C1 |
METHOD OF MULTIPHASE MUDDING OF PRODUCTIVE STRATUM | 2002 |
|
RU2235750C1 |
DRILLING MUD FOR TRANSITIONS CONSTRUCTION UNDER NATURAL AND ARTIFICIAL BARRIERS BY HORIZONTAL DIRECTIONAL DRILLING METHOD | 2005 |
|
RU2328513C2 |
METHOD FOR DRILLING AND PRIMARY OPENING OF PRODUCTIVE LAYERS | 2020 |
|
RU2753910C1 |
METHOD OF SLUDGE PITS RECLAMATION WITHOUT THEIR BACKFILLING ON FOREST FUND TERRITORY OF RUSSIAN FEDERATION IN MIDDLE TAIGA SUBZONE OF WESTERN SIBERIA | 2015 |
|
RU2617632C2 |
WELL KILLING METHOD | 2004 |
|
RU2283942C2 |
Authors
Dates
2018-11-07—Published
2017-11-21—Filed