FIELD: oil and gas industry.
SUBSTANCE: invention relates to oil and gas production industry and can be used in development of a poorly explored oil field. According to the method the field is drilled with a rare grid of wells. Detailed seismic surveys are performed in the drilled well. Predicted structural plan of the reservoir is specified. Direction of the prevailing fracture, decompression, decompression nodes – the intersection of decompression lines are determined. Existing grid of producing wells is compacted by means of drilling horizontal wells. These wells are placed at an angle of 45° to the direction of the prevailing fracturing – decompressions at a distance of more than 70 meters to them in order to prevent premature watering in production wells or absorption of injection – in injection wells. Pumping of working agent is done through injectors and recovery of products through producers.
EFFECT: increased oil production, increased development of oil reserves and the prevention of premature wetting of extracted products.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT OF A POORLY EXPLORED OIL FIELD | 2017 |
|
RU2659295C1 |
METHOD OF DEVELOPMENT OF A POORLY EXPLORED OIL FIELD | 2018 |
|
RU2683461C1 |
METHOD OF DEVELOPMENT OF A POORLY EXPLORED OIL DEPOSITS | 2018 |
|
RU2684556C1 |
LESS EXPLORED OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2546704C1 |
METHOD TO DEVELOP LOW-EXPLORED OIL DEPOSIT | 2011 |
|
RU2447270C1 |
METHOD FOR DEVELOPMENT OF EXPLORED OIL DEPOSIT | 2015 |
|
RU2587661C1 |
METHOD OF DEVELOPING DEPOSIT WITH FRACTURED RESERVOIRS | 2015 |
|
RU2595106C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2513962C1 |
METHOD OF DEVELOPING OIL DEPOSITS | 2015 |
|
RU2578090C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT | 2011 |
|
RU2439299C1 |
Authors
Dates
2018-12-28—Published
2017-08-03—Filed