FIELD: construction.
SUBSTANCE: invention relates to road construction, in particular to a method of building pavement, and can be used on agricultural roads with low traffic intensity in arid regions of Russia. Method of erecting a pavement consists in the fact that at first profiling and compaction of a road bed is carried out, then a working layer 10–20 cm thick is made of sandy soil. After that, the sand bed is moistened with a concentrated 0.85–1.50 % aqueous solution of technical lignosulfonate of normal temperature and at a rate of 2–5 l/m2 surface layer. Impregnated layer of sandy soil is compacted with a combined roller equipped with a vibrator weighing 10–15 tons in 8–10 passes one track to achieve the required compaction coefficient Kc=0.95–1.00. Above the impregnated layer of sandy soil, two layers of pavement are erected, while the lower layer is made of porous coarse-grained asphalt concrete 6–7 cm thick, and the upper layer is made of dense or high-density fine-grained asphalt concrete with thickness of 3–5 cm with alternate compaction of each layer with a smooth drum roller with mass of 10–15 tons in 4 passes in one track.
EFFECT: reducing the complexity of pavement construction.
1 cl, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR RECONSTRUCTION OF MEGAPOLICE RING HIGHWAY | 1998 |
|
RU2135672C1 |
MOTOR ROAD AND METHOD OF ITS OPERATION TOGETHER WITH REPAIR AND RECONSTRUCTION | 1998 |
|
RU2135671C1 |
METHOD FOR CONSTRUCTION OF BASE OF AERODROME AND ROAD PAVEMENTS FROM SUBSTANDARD SOILS | 2021 |
|
RU2767638C1 |
PAVEMENT LAYER METHOD FOR TRANSPORT INFRASTRUCTURE | 2017 |
|
RU2666949C1 |
METHOD TO ERECT ROAD SURFACING | 2012 |
|
RU2495181C1 |
METHOD FOR USE OF MEGALOPOLIS HIGHWAY | 1998 |
|
RU2140479C1 |
METHOD OF CONSTRUCTING PAVEMENT BASES OF MOTOR ROADS, PLATFORMS, SIDEWALKS BASED ON ASH-MINERAL MIXTURES | 1998 |
|
RU2153554C2 |
METHOD FOR CONSTRUCTION OF ROAD PAVEMENT AND CONSTRUCTION OF ROAD PAVEMENT | 2018 |
|
RU2714547C1 |
METHOD OF REINFORCING MOVABLE SANDS | 2018 |
|
RU2689106C1 |
METHOD TO WIDEN ROAD STRUCTURE (VERSIONS) | 2013 |
|
RU2538560C2 |
Authors
Dates
2019-01-23—Published
2017-12-29—Filed