FIELD: construction.
SUBSTANCE: invention relates to the field of construction, in particular to the lining of rough steps of stairs, located both in enclosed spaces and in places exposed to precipitation and negative temperatures, and also when using fixed formwork to form the front surface of the stairs. Technical result is achieved by the fact that the facing concrete element of the stair tread contains monolithically molded treads with a riser, on the tread there is a cornice, monolithically molded with tread, covering a gap between the tread of the upper facing element and the lower riser when facing the staircase.
EFFECT: technical result is to ensure the tightness of the cladding surface of the steps of the stairs, accelerate installation, hardening the outer edge of the step.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
COMPOSITE-MONOLITHIC LADDER AND METHOD OF ITS MANUFACTURING | 2017 |
|
RU2733246C2 |
FACING MEMBER FOR STAIR STEP AND PRODUCTION METHOD | 2006 |
|
RU2313643C1 |
FIXED FORMWORK FOR MAKING STAIRS | 2023 |
|
RU2821864C1 |
PREFABRICATED REINFORCED CONCRETE STAIRCASE (VERSIONS) | 2016 |
|
RU2631449C1 |
FIXED FORMWORK MODULE WITH DECORATIVE FACADE PANEL | 2023 |
|
RU2800972C1 |
ERECTION METHOD OF LINED BUILDING | 2018 |
|
RU2694662C1 |
LEAVE-IN-PLACE FORM BLOCK | 2007 |
|
RU2342502C1 |
BLOCK OF LEAVE-IN-PLACE FORM | 2012 |
|
RU2525459C2 |
FORMWORK BLOCK FOR MANUFACTURING SOLID STRUCTURES AND METHOD OF SOLID WALL ERECTION | 2013 |
|
RU2528303C1 |
METHOD OF ACCELERATED BUILDING ERECTION USING METHOD OF SCREWDRIVER ASSEMBLY AND BUILDING FROM FACADE PANELS WITH DECORATIVE EXTERNAL FINISHING AND METAL FRAMEWORK | 2016 |
|
RU2633602C1 |
Authors
Dates
2019-02-22—Published
2018-02-21—Filed