FIELD: machine building.
SUBSTANCE: invention relates to a high-pressure system for multiple hydraulic fracturing and a system of a manifold mounting hydraulic valve (MMHV) for connection with a production string to enable isolation of a prospective formation within a well. In particular, this system provides the possibility of access to a ground formation for hydraulic fracturing of a zone-of-interest formation and extracting raw hydrocarbons. System as a whole contains a plug counting system, a capturing system and a valve system, while dropping a group of plugs down the production string allows sequentially capturing individual plugs inside separate MMHV for successive hydraulic fracturing operations.
EFFECT: technical result is to increase the valve efficiency.
14 cl, 20 dwg
Title | Year | Author | Number |
---|---|---|---|
HIGH-PRESSURE SYSTEM FOR MULTIPLE HYDRAULIC FRACTURING WITH COUNTING SYSTEM | 2015 |
|
RU2651646C2 |
STEPPED BUSHING FOR MULTISTAGE HYDRAULIC FRACTURING IN ONE ROUND TRIP OPERATION | 2012 |
|
RU2495994C1 |
METHOD FOR COMPLETING A HORIZONTAL SIDETRACK BOREHOLE FOLLOWED BY MULTI-STAGE HYDRAULIC FRACTURING | 2021 |
|
RU2775628C1 |
METHOD FOR MULTI-STAGE HYDRAULIC FRACTURING IN WELL WITH HORIZONTAL TERMINATION | 2019 |
|
RU2732891C1 |
METHOD OF INTERVAL MULTISTAGE HYDRAULIC FRACTURING OF FORMATION IN OIL AND GAS WELLS | 2016 |
|
RU2634134C1 |
DEVICE AND SYSTEM (VERSIONS) FOR INCREASE OF LIQUID RECOVERY FROM UNDERGROUND BEDS | 1997 |
|
RU2196892C2 |
WATER SAND BLAST PERFORATOR WITH HYDRAULIC ACTION PACKER | 2022 |
|
RU2796373C1 |
SEAT POCKET SYSTEM WITH COLLET CHUCK AND METHOD OF HYDROCARBON FORMATION RUPTURE | 2016 |
|
RU2719846C2 |
PROCESS OF TERMINATION OF CONSTRUCTION OF WELLS AND GEAR FOR ITS IMPLEMENTATION | 2000 |
|
RU2165516C1 |
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF WELL WITH HYDROFRACTURING | 2016 |
|
RU2620818C1 |
Authors
Dates
2019-03-14—Published
2015-07-21—Filed