HIGH-PRESSURE SYSTEM FOR MULTIPLE HYDRAULIC FRACTURING WITH COUNTING SYSTEM Russian patent published in 2019 - IPC E21B34/14 E21B43/26 

Abstract RU 2681969 C2

FIELD: machine building.

SUBSTANCE: invention relates to a high-pressure system for multiple hydraulic fracturing and a system of a manifold mounting hydraulic valve (MMHV) for connection with a production string to enable isolation of a prospective formation within a well. In particular, this system provides the possibility of access to a ground formation for hydraulic fracturing of a zone-of-interest formation and extracting raw hydrocarbons. System as a whole contains a plug counting system, a capturing system and a valve system, while dropping a group of plugs down the production string allows sequentially capturing individual plugs inside separate MMHV for successive hydraulic fracturing operations.

EFFECT: technical result is to increase the valve efficiency.

14 cl, 20 dwg

Similar patents RU2681969C2

Title Year Author Number
HIGH-PRESSURE SYSTEM FOR MULTIPLE HYDRAULIC FRACTURING WITH COUNTING SYSTEM 2015
  • Graf Robert James
  • Smolka Robert Steve
RU2651646C2
STEPPED BUSHING FOR MULTISTAGE HYDRAULIC FRACTURING IN ONE ROUND TRIP OPERATION 2012
  • Robinson Klark Eh.
  • Kun Robert
  • Mehlloj Robert
RU2495994C1
METHOD FOR COMPLETING A HORIZONTAL SIDETRACK BOREHOLE FOLLOWED BY MULTI-STAGE HYDRAULIC FRACTURING 2021
  • Shamsutdinov Nikolaj Maratovich
  • Milkov Aleksandr Yurevich
  • Elshin Aleksandr Sergeevich
  • Leontev Dmitrij Sergeevich
RU2775628C1
METHOD FOR MULTI-STAGE HYDRAULIC FRACTURING IN WELL WITH HORIZONTAL TERMINATION 2019
  • Shamsutdinov Nikolaj Maratovich
  • Bityukov Vladimir Valerevich
  • Sergeev Sergej Yurevich
  • Grigorev Andrej Petrovich
  • Leontev Dmitrij Sergeevich
  • Ovchinnikov Vasilij Pavlovich
RU2732891C1
METHOD OF INTERVAL MULTISTAGE HYDRAULIC FRACTURING OF FORMATION IN OIL AND GAS WELLS 2016
  • Gimaev Artur Faatovich
  • Erenyakov Oleg Fedorovich
RU2634134C1
DEVICE AND SYSTEM (VERSIONS) FOR INCREASE OF LIQUID RECOVERY FROM UNDERGROUND BEDS 1997
  • Kelli Terri E.
  • Snajder Robert E.
RU2196892C2
WATER SAND BLAST PERFORATOR WITH HYDRAULIC ACTION PACKER 2022
  • Mikhailov Aleksei Iurevich
RU2796373C1
SEAT POCKET SYSTEM WITH COLLET CHUCK AND METHOD OF HYDROCARBON FORMATION RUPTURE 2016
  • Rokhas Deniel
  • Nordkhajmer Devid
RU2719846C2
PROCESS OF TERMINATION OF CONSTRUCTION OF WELLS AND GEAR FOR ITS IMPLEMENTATION 2000
  • Galeev Eh.M.
  • Prokshin V.V.
  • Akchurin Kh.I.
  • Vjakhirev V.I.
  • Ippolitov V.V.
  • Sukmanskij O.B.
  • Gnoevykh A.N.
  • Jaichnikov E.A.
  • Glebov V.I.
  • Remizov V.V.
RU2165516C1
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF WELL WITH HYDROFRACTURING 2016
  • Strakhov Dmitrij Vitalevich
  • Ibatullin Rinat Rasimovich
RU2620818C1

RU 2 681 969 C2

Authors

Smolka, Robert Steve

Graf, Robert James

Dates

2019-03-14Published

2015-07-21Filed