FIELD: mining.
SUBSTANCE: invention relates to mining and can be used in the development of mineral deposits in the chamber and pillar systems of development with the laying of the goaf. This goal is achieved by defining and strengthening only that part of the inter-chamber pillar in which its deformations exceed the permissible limits, that is, by partial laying of the developed space in the case of chamber development systems, for this, in accordance with the source data and the geometrical parameters of the backfill site, a plot of load distribution - γ1H and soil deposits - γ1H+γ2h on the roof of the reservoir is built, the allowable load (allowable pressure) on the ground pillar Pallow is determined, the line passing through the intersection point of these two graphs determines the minimum required bookmark level, and the tab itself of the worked-out space is produced below the intersection point of these diagrams, that is, where the calculated pressure on the cell is greater than the allowable one, taking into account the engineering calculation error equal to 20–30 %.
EFFECT: technical result is an increase in the efficiency of the backfilling operations by partially laying the worked-out space to the level of permissible pressure on the pillar ground.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRACTING SALT DEPOSITS | 2003 |
|
RU2235879C1 |
METHOD OF EXTRACTION OF MINERALS OF PILLARS | 2015 |
|
RU2610456C1 |
METHOD FOR EXTRACTING DEPOSITS OF WATER-SOLUBLE MINERAL RESOURCES | 2004 |
|
RU2254471C1 |
METHOD FOR ERECTION OF ARTIFICIAL CEILING | 1996 |
|
RU2116457C1 |
MINING METHOD OF THIN FLAT ORE BODY | 2010 |
|
RU2456452C2 |
METHOD OF COMPLEX DEVELOPMENT AND UTILIZATION OF MINERAL RESOURCES | 2000 |
|
RU2188945C2 |
METHOD OF ERECTING MAN-MADE PILLAR WHEN WORKING SLOPING ORE BODIES AND ROD FOR ERECTING MAN-MADE PILLAR | 0 |
|
SU1004640A1 |
METHOD FOR PREPARING INTER-CHAMBER BLOCKS FOR EXTRACTION | 2002 |
|
RU2249112C2 |
METHOD OF MINING OF SALINE DEPOSITS | 2002 |
|
RU2209971C1 |
DEVELOPMENT OF THICK GENTLY SLOPING POTASSIUM BEDS | 2014 |
|
RU2585318C1 |
Authors
Dates
2019-04-11—Published
2018-05-16—Filed