METHOD AND SYSTEM FOR COMBINED TRACKING OF A WELL DRILLING PROCESS Russian patent published in 2019 - IPC E21B47/00 E21B7/04 

Abstract RU 2687668 C1

FIELD: data processing.

SUBSTANCE: disclosed solution relates to methods and systems for computer-aided processing of specialized data for providing the process of tracking well drilling. Disclosed method of combined tracking of drilling process consists in performance of stages, at which: obtaining input data of the developed well, including at least data of inclination measurements, GIS data and core data; obtaining logging data of at least one support well; generating, based on said input data and logging data of at least one support well, a combined model displaying rock characteristics and predicting the well borehole position; determining at least one planned path of drilling direction of the developed well based on logging data of at least one reference well; performing calculation of at least one synthetic logging curve based on said combined model and at least one planned path of drilling direction of the developed well; constructing a preliminary model of stability of the well bore, based on determined at least one trajectory of the developed well and calculated at least one synthetic curve; based on the constructed preliminary model of the borehole stability the planned trajectory ensuring maximum well drilling within the target interval and stability of the well shaft; obtaining parameters during drilling of the developed well, characterizing the survey, GIS data and drilling parameters; said combined model is updated and the process of the developed well is controlled based on the updated combined model.

EFFECT: high accuracy of simulating the process of borehole drilling within the target interval with monitoring stability of the well bore.

7 cl, 18 dwg

Similar patents RU2687668C1

Title Year Author Number
METHOD OF AUTOMATED GEOLOGICAL SURVEY OF WELLS AND SYSTEM FOR ITS IMPLEMENTATION 2018
  • Stishenko Sergej Igorevich
RU2720115C1
METHOD FOR COMBINING A MODEL OF GEOLOGICAL WELL PASSING WITH OPERATIONAL PETROPHYSICAL INTERPRETATION OF GIS DATA IN REAL TIME AND A SYSTEM IMPLEMENTING THE METHOD 2020
  • Tatur Olga Aleksandrovna
  • Stishenko Sergei Igorevich
  • Sobolev Aleksei Evgenevich
  • Petrakov Iurii Anatolevich
RU2745152C1
METHOD OF GUIDING HORIZONTAL WELLBORE IN TARGET RANGE OF SEDIMENTARY ROCKS BASED ON ELEMENTAL ANALYSIS OF SLURRY 2019
  • Nemova Varvara Dmitrievna
RU2728000C1
STRATIGRAPHIC AND STRUCTURAL INTERPRETATION OF DEVIATED AND HORIZONTAL WELLBORES 2014
  • Chzhan Tuanfen
  • Kherli Nejl F.
  • Akkurt Ridvan
  • Makkormik Devid S.
  • Chzhan Shu
RU2652172C2
METHOD FOR HORIZONTAL WELL GEOSTEERING IN BLACK SHALE OIL-BEARING FORMATIONS 2018
  • Panchenko Ivan Vladimirovich
  • Kulikov Petr Yurevich
  • Gusev Ivan Mikhajlovich
  • Gavrilov Sergej Sergeevich
RU2702491C1
METHOD OF GEONAVIGATION OF HORIZONTAL WELLS 2001
  • Antonov Ju.N.
  • Ehpov M.I.
  • Glebocheva N.K.
  • Medvedev N.Ja.
  • Ikhsanov R.K.
RU2230343C2
DEFINITION METHOD OF VERTICAL AND HORIZONTAL SPECIFIC RESISTANCE, AND ALSO ANGLES OF RELATIVE INCLINATION IN ANISOTROPIC GEOLOGICAL MATERIALS 2003
  • Otto Fanini
  • Gulamabbas Merchant
RU2368922C2
METHOD AND COMPUTER SYSTEM FOR CONTROL OF DRILLING OF THE WELLS 2019
  • Antipova Kseniya Aleksandrovna
  • Koroteev Dmitrij Anatolevich
  • Klyuchnikov Nikita Andreevich
RU2723805C1
SIMULATION OF STRESS AROUND WELL SHAFT 2012
  • Bai Mao
RU2589300C1
METHOD FOR GEOSTEERING OF HORIZONTAL WELLS AND DEVICE FOR ITS REALISATION 2008
  • Teplukhin Vladimir Klavdievich
RU2395823C2

RU 2 687 668 C1

Authors

Stishenko Sergej Igorevich

Petrakov Yurij Anatolevich

Sobolev Aleksej Evgenevich

Dates

2019-05-15Published

2018-10-16Filed