FIELD: geophysics.
SUBSTANCE: invention relates to geophysics and can be used for optimisation of works related to development of hydrocarbon deposits. Disclosed are methods for modelling stress around wellbore, comprising calibrating a geomechanical model that contains geological information related to subterranean zone, based on stress polygon method. Method includes generating an output signal based on state of stress of subterranean zone based on calibrated geomechanical model. In a first aspect, combinable with general embodiment, geometric calibration model based on stress polygon method is to consider that limit of unconfined compressive strength associated with underground area.
EFFECT: technical result is improved accuracy of obtained data.
28 cl, 20 dwg, 3 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HORIZONTAL METHANE COAL WELL DESIGN SELECTION | 2019 |
|
RU2720859C1 |
SYSTEM AND METHOD FOR PERFORMING OPERATIONS FOR STIMULATION OF RESOURCES | 2013 |
|
RU2591857C1 |
METHOD AND SYSTEM FOR COMBINED TRACKING OF A WELL DRILLING PROCESS | 2018 |
|
RU2687668C1 |
METHOD OF TYING GEOMETRY OF HYDRAULIC FRACTURING TO MICROSEISMIC EVENTS | 2013 |
|
RU2602858C1 |
PRODUCTION SIMULATION METHOD AND SYSTEM | 2012 |
|
RU2567067C1 |
SYSTEM AND METHOD OF WELL PRODUCTION INTENSIFICATION | 2011 |
|
RU2561114C2 |
SYSTEM AND METHOD OF WELL PRODUCTION INTENSIFICATION | 2011 |
|
RU2569116C2 |
METHOD FOR CHECKING FRACTURE GEOMETRY FOR MICROSEISMIC EVENTS | 2014 |
|
RU2637255C2 |
METHODS AND SYSTEMS FOR ANALYSING ROCK PROPERTIES WHEN PERFORMING UNDERGROUND WORK | 2011 |
|
RU2580872C2 |
METHOD OF IMPROVED PLANNING OF THE HEIGHT OF A HYDRAULIC FRACTURING CRACK IN A LAYERED ROCK OF UNDERGROUND FORMATION | 2015 |
|
RU2651719C1 |
Authors
Dates
2016-07-10—Published
2012-05-14—Filed