FIELD: construction.
SUBSTANCE: stone arched bridge comprises a stone arch and a support superstructure wall at each end of the stone arch. Method includes steps of forming movable part of rock arched bridge by cutting support superflat walls to form cut on each side of stone arch, lifting force is applied to stone arch to raise stone arch to raised position, and stone arch is fixed in raised position.
EFFECT: invention relates to a method of increasing space under a stone arched bridge.
29 cl, 34 dwg
Title | Year | Author | Number |
---|---|---|---|
ARCHED BRIDGE | 2014 |
|
RU2567253C1 |
ARCH BRIDGE WITH TRAFFIC ON TOP | 2000 |
|
RU2167975C1 |
ARCH-TYPE DECK BRIDGE AND METHOD FOR ITS MANUFACTURE | 2000 |
|
RU2171330C1 |
METHOD FOR RECONSTRUCTION OF OVERPASS WITH DISPLACEMENT OF RECONSTRUCTED RAILWAY BRIDGE AFLOAT | 1999 |
|
RU2152477C1 |
METAL ARCH BRIDGE | 0 |
|
SU1019046A1 |
ARCH-TYPE FILLED BRIDGE | 2003 |
|
RU2236498C1 |
ARCH BRIDGE | 2009 |
|
RU2403335C1 |
METHOD FOR DISASSEMBLY OF ARCH BRIDGE | 2022 |
|
RU2800582C1 |
PREFABRICATED SOLID ARCH DAM | 0 |
|
SU1330251A1 |
BRIDGE MANUFACTURING METHOD (VERSIONS) AND BRIDGE | 2007 |
|
RU2436890C2 |
Authors
Dates
2019-06-07—Published
2015-05-01—Filed