FIELD: transportation.
SUBSTANCE: transport facility (10) for transportation of extracted material (14) has: conveyor unit with conveyor belt (12) and loading device (18). Conveyor plant has first device (20) for shaping a belt, to which conveyor belt (12) of a substantially flat shape, until reaching loading device (18) can be U-shaped, and wherein the U-shape has a cross-section constant in the conveying direction, and second device (21) for shaping the closed hose conveyor belt (12) in the transportation direction after loading device (18). Loading device (18) has collection area (36), which is made so that produced material (14) is deposited in it and forms reflecting surface (38), on which produced material (14) can be loaded.
EFFECT: high loads on the conveyor belt and guide devices for the belt are prevented and their damages are reduced.
13 cl, 15 dwg
Title | Year | Author | Number |
---|---|---|---|
COMPLEX FOR OPEN-PIT MINING AND THE METHOD FOR ITS OPERATION | 2020 |
|
RU2774885C1 |
CONVEYOR PLANT FOR OPEN DEVELOPMENT | 2016 |
|
RU2696894C2 |
CONVEYOR SYSTEM AND METHOD OF CONVEYING FLAT ARTICLES | 2008 |
|
RU2482047C2 |
DEVICE FOR TRANSPORTATION AND INSTALLATION FOR PROCESSING SURFACES OF ARTICLES | 2012 |
|
RU2594324C2 |
DEVICE FOR TRANSPORTING MATERIAL LIKE BRICK FOR REFRACTORY FACING OF RESERVOIR WITH HOLE AND BULGE | 0 |
|
SU1176824A3 |
STEEP INCLINE CONVEYOR UNIT FOR OPEN WORKING | 2013 |
|
RU2636634C2 |
TRANSPORTATION DEVICE | 1997 |
|
RU2168453C2 |
DEVICE FOR CHANGING POSITION OF ARTICLES TRANSPORTED IN CASCADE FLOW | 1998 |
|
RU2194002C2 |
DEVICE AND METHOD FOR PICKING UP FLAT OBJECTS | 2009 |
|
RU2527287C2 |
METHOD AND DEVICE FOR TRANSPORTATION OF SEPARATE ARTICLES | 1997 |
|
RU2188150C2 |
Authors
Dates
2019-06-14—Published
2017-02-21—Filed