FIELD: oil and gas industry.
SUBSTANCE: invention relates to oil and gas industry, in particular to devices for installation of shaped shutters in isolation of complication zones. Device includes cylindrical part and guide part with oblique cut, side hole with nozzle for passage of liquid from cut side. Cylindrical and guide parts are interconnected by hinged joint allowing limited deflection of guide part relative to device axis, wherein valve seat is installed in its cylindrical part. Guide part is equipped with longitudinal hole extending to oblique cut of smaller diameter than diameter of side hole, bushing valve for free passage of liquid in transport position is fixed inside profile pipe above guide shoe on pins, fixed inside cavities, is equipped with upper and lower rods, rubber cuff in upper part, grooves with sealing rings and spring retainer located on bush case below cuff for interaction with sealing surfaces and annular recess made in valve seat body after valve sleeve release when straightening profile shutter. Cylindrical and guide parts are connected by semi-axles, and inner cavity is sealed by elastic sleeve fixed tightly in cylindrical and guide parts with cone bushes. Guide shoe from above is equipped with end projections for interaction with protrusions of catcher for turn-up, below which spring retainer is installed, connecting and retaining shoe on fishing tool when it is removed from well.
EFFECT: simplified method of delivery and installation of profiled shutter and extraction of shoe after its installation in well, improved quality and reliability of isolation of zones of complications, especially in horizontal and ST multi-lateral wells.
1 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
GUIDE SHOE FOR INSTALLATION OF SHAPED SHUTTER IN WELL | 2019 |
|
RU2720728C1 |
METHOD FOR CONSTRUCTION OF MULTI-BARREL WELL AND GUIDE DEVICE FOR INSTALLATION OF CASING STRING IN ITS ADDITIONAL SHAFT | 2018 |
|
RU2695911C1 |
METHOD FOR INSTALLATION OF SHAPED SHUTTER IN WELL AND DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2705671C1 |
METHOD FOR INSTALLATION OF SHAPED SHUTTER IN WELL AND DEVICE FOR ITS IMPLEMENTATION | 2019 |
|
RU2719881C1 |
DEVICE FOR ISOLATION OF A COMPLICATION ZONE WITH PRE-FLUSHING | 2019 |
|
RU2708740C1 |
DEVICE FOR ISOLATING PROBLEMATIC ZONES BY PROFILE SHUTTER WITH CYLINDRICAL SECTIONS AT WELL DRILLING | 2016 |
|
RU2618546C1 |
INSTALLATION METHOD OF SHAPED OVERLAPPING MECHANISM IN WELL AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2435930C1 |
EXPANDABLE TUBULAR SYSTEM WITH INTERMEDIATE FLUSHING FOR ISOLATION OF ZONES OF COMPLICATIONS DURING DRILLING OF WELLS | 2019 |
|
RU2703041C1 |
DEVICE TO ISOLATE PROBLEMATIC ZONES BY PROFILE PACKER WITH CYLINDRICAL SECTIONS AT WELL DRILLING | 2013 |
|
RU2522326C1 |
SHOE FOR INSTALLATION OF SHAPING STRUTOFF DEVICE IN WELL | 2001 |
|
RU2208125C2 |
Authors
Dates
2019-11-28—Published
2019-02-01—Filed