FIELD: construction.
SUBSTANCE: invention relates to military bridge engineering. Pontoons installed in transverse direction to axis of bridge are combined into continuous structure along whole length of river part by means of connecting frame blocks installed in several rows. Special connecting frame structure receives and transmits, mainly, longitudinal loads acting along axis of axle from weight of structures and temporary load from rolling stock. Frame receives and transfers loads from pontoons to each other, both in level of deck, and in bottom level. Loads in the level of the deck receive and transmit the upper frame belt. Bending moment occurring in frame from longitudinal load in bottom level of pontoons, which are not connected by straight structural elements to prevent constraint of current flow, is transferred by vertical support shaped elements from upper belt to lugs in level of pontoons bottom. Shaped elements (two - on the frame) represent a quadrangular steel plate with parallel horizontal upper and lower sides, a vertical side adjoining the pontoon board, and an inclined side rising from the lower lug to the upper frame belt. Frame unit consists of two frames interconnected by longitudinal links.
EFFECT: invention can be used in development of structures of inventory surfaced railway bridges.
1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DOCKING OF RIVER PARTS OF FLOATING BRIDGES MLZH-VF-VT AND NZHM-56 | 2018 |
|
RU2692363C1 |
METHOD OF BANK COMPENSATION FOR INVENTORY SURFACING RAILWAY BRIDGE AT HIGH SPEED OF RIVER FLOW | 2020 |
|
RU2739543C1 |
METHOD FOR JOINING COASTAL AND RIVER PARTS OF FLOATING UNIFIED RAILWAY RIBBON BRIDGE MLZH-VF-VT | 2020 |
|
RU2750370C1 |
FLOATING RAILWAY BRIDGE | 2021 |
|
RU2755794C1 |
METHOD FOR TRANSPORTATION OF AUTHORIZED EQUIPMENT OF FLOATING RAILWAY RIBBON-BRIDGE TO SUSTAIN TRAIN LOADS USING MILITARY-FRONT, MILITARY-REAR (MLZH-VF-VT) ASSEMBLY SCHEME BY WATER | 2017 |
|
RU2667422C2 |
GROUND METHOD FOR ASSEMBLING BRIDGE FERRIES OF FLOATING RAILWAY BRIDGE | 2021 |
|
RU2819230C2 |
METHOD FOR COMPENSATING FOR TEMPERATURE CHANGES IN THE LENGTH OF THE NzHm-56 FLOATING RAILWAY BRIDGE DURING THE WITHDRAWAL AND INPUT OF THE OUTLET FERRY DURING THE PASSING THROUGH OF SHIPS | 2020 |
|
RU2745580C1 |
METHOD OF CONSTRUCTING AIRSHIP BRIDGE OVER CANYON | 2023 |
|
RU2816641C1 |
FLOATING RAILWAY BRIDGE | 2000 |
|
RU2158331C1 |
RIVER BOAT UNIT OF FLOATING RAILROAD BRIDGE | 2014 |
|
RU2575293C1 |
Authors
Dates
2020-03-13—Published
2018-11-26—Filed