INJECTION PILE ERECTION METHOD Russian patent published in 2007 - IPC E02D5/34 

Abstract RU 2304198 C2

FIELD: construction, particularly for injection and bored cast-in-place pile erection during building base and foundation construction.

SUBSTANCE: method involves drilling well in ground and filling the well with concrete. Well is drilled simultaneously with soil-cement pile forming by immersing hollow casing pipe in ground. The casing pipe has one end closed during casing pipe immersion in ground and is provided with monitor fixedly secured to the closed end. Monitor is adapted to erode ground by hardening mix jet along with following ground mixing with hardening mix up to design well depth reaching. After that monitor is removed from hollow casing pipe and reinforcement frame is installed in the casing pipe. The casing pipe is filled with concrete having sloppy consistency up to well head. Following pile body is formed by progressive casing pipe lifting along with simultaneously concrete mix supply under pressure in well up to formed space filling.

EFFECT: increased quality, service life and load-bearing ability of injection piles along with decreased construction time due to increased capacity.

Similar patents RU2304198C2

Title Year Author Number
METHOD FOR ERECTION OF BORED PILE IN SOIL-CEMENT COATING 2019
  • Sokolov Nikolaj Sergeevich
  • Mikhajlov Aleksandr Nikolaevich
  • Pushkarev Aleksandr Evgenevich
  • Sokolov Sergej Nikolaevich
  • Sokolov Andrej Nikolaevich
RU2720047C1
DRILL STRING FOR ERECTION OF BORED PILE IN SOIL-CEMENT CLADDING 2019
  • Mikhajlov Aleksandr Nikolaevich
  • Pushkarev Aleksandr Evgenevich
  • Sokolov Nikolaj Sergeevich
  • Sokolov Sergej Nikolaevich
  • Sokolov Andrej Nikolaevich
RU2735077C1
METHOD FOR CAST-IN-PLACE PILE ERECTION 2005
  • Arutjunov Igor' Sergeevich
  • Kalganov Aleksej Jur'Evich
  • Pushkarev Aleksandr Evgen'Evich
  • Pushkarev Vladimir Aleksandrovich
RU2303102C1
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) 2019
  • Mikhajlov Aleksandr Nikolaevich
  • Pushkarev Aleksandr Evgenevich
  • Sokolov Nikolaj Sergeevich
  • Sokolov Sergej Nikolaevich
  • Sokolov Andrej Nikolaevich
  • Savchuk Aleksandr Dmitrievich
RU2725363C1
PROCESS OF ERECTION OF ENCLOSING WALL IN GROUND 2001
  • Chernjakov A.V.
  • Chernjakov V.G.
  • Kaeshkov S.D.
  • Kozlov I.V.
  • Poderegin A.N.
  • Smagin Ju.N.
RU2204656C1
PROCESS OF ERECTION OF DRILLED AND CAST-IN-PLACE PILE 2001
  • Chernjakov A.V.
  • Chernjakov V.G.
  • Kaeshkov S.D.
  • Kozlov I.V.
  • Poderegin A.N.
  • Smagin Ju.N.
RU2204651C1
PROCESS OF DEVELOPMENT OF FOUNDATION PIT 2002
  • Chernjakov A.V.
  • Bogomolova O.V.
  • Varygin V.N.
  • Volynets A.Z.
  • Kaeshkov S.D.
  • Kal'Ko A.V.
  • Kozlov I.V.
  • Tsykin B.A.
RU2209268C1
METHOD FOR CONSTRUCTING DRILLED PILE IN PERMAFROST SOIL 2023
  • Popsuenko Ivan Konstantinovich
  • Alekseev Andrei Grigorevich
  • Zorin Dmitrii Vasilevich
RU2803751C1
METHOD FOR RECLAMATION OF LIMESTONE QUARRIES DURING CONSTRUCTION OF INDUSTRIAL STRUCTURES 2006
  • Boldyrev Oleg Valentinovich
  • Lubochkin Igor' Pavlovich
  • Mukhortov Vasilij Vasil'Evich
  • Olejnik Sergej Pavlovich
  • Radzhabov Nurullo Makhmudovich
  • Sulejmanov Gasangusejn Sultanovich
RU2289694C1
METHOD OF DRILL-INJECTION STILT FORMATION 2006
  • Popsuenko Ivan Konstantinovich
RU2327007C1

RU 2 304 198 C2

Authors

Arutjunov Igor' Sergeevich

Bagdasarov Jurij Arshavirovich

Dates

2007-08-10Published

2005-06-03Filed