FIELD: mining.
SUBSTANCE: invention relates to a method of installing an anchor mine development anchor, intended for attachment of both horizontal and inclined development workings, and rifled openings of any shape and cross-section, different purpose and service life, both newly carried out and previously passed. According to method anchors, tensioners, flexible rope grips and tightening are installed, which support uncovered surface of mine working roof. At that, in order to increase load-bearing capacity of the support and to improve its working characteristics in compliance mode, tensioning devices are installed on the threaded ends of the anchors protruding into the opening and fixed with nuts, and flexible grippers, pressing the lug from timber to the mine working roof, are suspended on traction devices rods. To ensure a reliable fixing of roof bolting maximum shrink tension force of the flexible pickup (Tmax) has to be correlated with a load capacity of the anchor (Ranch) according to the following condition: Tmax ≤ Ranch⋅cosα, where: Tmax is maximum tension force of the flexible pickup, kN, Ranch is bearing capacity of the anchor, kN, α - anchors angle setting, deg.
EFFECT: provision of reliable fixation of tightening anchor support.
1 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINE WORKINGS SUPPORT | 2000 |
|
RU2177550C1 |
METHOD FOR SUPPORTING JUNCTIONS OF UNDERGROUND WORKINGS | 1996 |
|
RU2116454C1 |
0 |
|
SU1776805A1 | |
MINING WORKING ANCHOR FRAME SUPPORT | 0 |
|
SU1125378A1 |
PROCESS OF DEVELOPMENT OF GENTLY DIPPING AND INCLINED COAL FORMATIONS WITH USE OF CLEANING POWERED COMPLEXES | 2001 |
|
RU2200840C2 |
METHOD FOR FLEXIBLE FASTENING OF INTER-CHAMBER PILLARS IN SALT ROCKS | 2022 |
|
RU2788185C1 |
METHOD OF REINFORCING PILLARS | 0 |
|
SU1305358A1 |
ROOF BOLT LOCKED BY FIRING | 2010 |
|
RU2451182C1 |
TIMBERING METHOD OF MINE OPENING | 2008 |
|
RU2371582C1 |
METHOD OF CONSOLIDATING PILLARS | 0 |
|
SU1555498A1 |
Authors
Dates
2020-12-02—Published
2020-03-20—Filed