FIELD: oil and gas industry.
SUBSTANCE: invention relates to oil and gas industry and is intended for wells operated by electric centrifugal pumps (EDCPU) in sloping sections of production strings. Pump-and-ejector unit comprises a check valve shutoff assembly at the inlet of the low-pressure flow from the annular space into the pumping-ejector unit. Shutoff assembly is equipped with return spring to ensure operability of check valve and entire set of downhole equipment EDCPU in sloping sections of production wells.
EFFECT: enabling operation of electric centrifugal pumps in wells with inclined directed sections of production strings with deviation from vertical of more than 40 and 90 degrees (zenith angle) under conditions of pressure drop at EDCPU reception below saturation pressure with high and ultrahigh gas factor.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF ACCEPTANCE AND EXAMINATION OF WELLS, OF INTENSIFICATION OF OIL AND GAS INFLOWS, OF CONDUCTING WATER- INSULATION WORK AND GEAR FOR IMPLEMENTATION OF PROCESS | 2001 |
|
RU2179631C1 |
METHOD OF OIL AND GAS INFLUX DEVELOPMENT AND INTENSIFICATION, WATERPROOFING PROCEDURE AND RELATED DEVICE FOR IMPLEMENTATION THEREOF | 2006 |
|
RU2345214C2 |
BOREHOLE PLANT FOR SIMULTANEOUS SEPARATE AND ALTERNATE OPERATION OF SEVERAL FORMATIONS BY SINGLE WELL | 2003 |
|
RU2262586C2 |
METHOD OF PRESSURE TESTING OF PUMP-COMPRESSOR PIPES IN WELLS WITH HORIZONTAL COMPLETION | 2023 |
|
RU2809394C1 |
METHOD OF EXTRACTING FLUID FROM RESERVOIR OF ONE WELL WITH ELECTRIC DRIVE PUMP EQUIPPED WITH ELECTRIC VALVE AND INSTALLATION FOR IMPLEMENTATION OF THIS METHOD | 2008 |
|
RU2385409C2 |
DEVELOPMENT METHOD OF OIL WELLS (VERSIONS), AND PLANT FOR ITS IMPLEMENTATION (VERSIONS) | 2010 |
|
RU2471065C2 |
JET-TYPE HYDRAULIC MANIPULATOR | 1996 |
|
RU2105146C1 |
PROCEDURE FOR INSULATING PERMEABLE SECTION OF PRODUCTION STRING OR PERFORATED INTERVAL OF IDLE FORMATION OF WELL (VERSIONS) | 2008 |
|
RU2383713C1 |
METHOD FOR PROCESSING THE BOTTOMHOLE FORMATION ZONE AND THE DEVICE FOR ITS IMPLEMENTATION | 2022 |
|
RU2782227C1 |
METHOD OF DETERMINING AIR-TIGHTNESS OF DOWNHOLE EQUIPMENT WITH DUAL EXTRACTION OF FLUIDS FROM WELL WITH SUCKER-ROD AND ELECTRIC-CENTRIFUGAL PUMP | 2015 |
|
RU2589016C1 |
Authors
Dates
2020-12-09—Published
2020-02-18—Filed