CRANE BEAM Russian patent published in 2021 - IPC B66C6/00 E04C3/29 

Abstract RU 2740608 C1

FIELD: construction.

SUBSTANCE: invention relates to construction, namely, to crane girders. Crane girder consists of upper belt (1) in form of steel pipe (2), filled with concrete (3), brake structure (4), posts (5) with end (6) and tightening (7), passed through end (6) in posts (5) and fixed on support sections (8) of upper belt (1). Pins (9) are horizontally fitted through section of upper belt (1), to which clamps (10) for attachment of crane rail (11) are attached. Walls of steel pipe (2) of upper belt (1) have perforations (12). Brake structure (4) consists of steel horizontal truss (13) and steel beam (14). Stands (5) made of steel pipes uniformly arranged along the length of upper belt (1), have variable length f, increasing from support sections (8) to middle span of beam L. Tightening (7), made in form of reinforcement rods or ropes, located along the span of the beam L in accordance with the envelope curve of the bending moment in the beam. Support sections (8) are made as composite of sheet steel and rigidly fixed to steel pipe (2) of upper belt (1).

EFFECT: reduced material consumption of crane girder.

3 cl, 3 dwg

Similar patents RU2740608C1

Title Year Author Number
PRELIMINARY STRESS-BEARING REINFORCED BEAM 2018
  • Veselov Vitalij Vladislavovich
  • Abaturova Tatyana Dmitrievna
  • Kopacheva Mariya Vladimirovna
RU2675002C1
PRELIMINARY STRESS-BEARING REINFORCED BEAM 2018
  • Veselov Vitalij Vladislavovich
  • Abaturova Tatyana Dmitrievna
  • Kopacheva Mariya Vladimirovna
RU2677188C1
RAIL-AND-BEAM STRUCTURE 2000
  • Nezhdanov K.K.
  • Tumanov V.A.
  • Nezhdanov A.K.
  • Karev M.A.
RU2191154C2
CRANE RUNWAY METAL STRUCTURE 1998
  • Nezhdanov K.K.
  • Epifanov A.R.
  • Nezhdanov A.K.
RU2196097C2
METHOD OF DAMPING OVERHEAD CRANE EFFECTS AND UNLOADING REINFORCED-CONCRETE SUPPORT OF COLUMN DISINTEGRATING FROM CONCRETE REINFORCEMENT CORROSION 2010
  • Nezhdanov Kirill Konstantinovich
  • Nezhdanov Aleksej Kirillovich
  • Tonnikov Dmitrij Valer'Evich
RU2457998C2
STEEL-CONCRETE BEAM 2016
  • Egorov Vladimir Viktorovich
  • Veselov Vitalij Vladislavovich
RU2621247C1
RAIL-AND-BEAM STRUCTURE 2000
  • Nezhdanov K.K.
  • Nezhdanov A.K.
  • Tumanov V.A.
RU2240275C2
STEEL-REINFORCED CONCRETE BEAM 2020
  • Veselov Vitalij Vladislavovich
  • Egorov Vladimir Viktorovich
RU2745287C1
LATTICE CRANE STRUCTURE 1997
  • Nezhdanov K.K.
  • Nezhdanov A.K.
  • Popchenkov I.V.
RU2142904C1
RAIL-AND-BEAM UNIT FOR PARALLEL RAIL TRACKS 2005
  • Nezhdanov Kirill Konstantinovich
  • Tumanov Vjacheslav Aleksandrovich
  • Kuz'Mishkin Aleksej Aleksandrovich
  • Nezhdanov Aleksej Kirillovich
RU2288886C2

RU 2 740 608 C1

Authors

Veselov Vitalij Vladislavovich

Perminova Tatyana Andreevna

Dates

2021-01-15Published

2020-09-07Filed