FIELD: transport machine building.
SUBSTANCE: invention relates to major gas pipeline transport and is intended for removal of hydrocarbon gas from gas pipeline section in preparation for repair, connected with replacement of pipe sections or making frames. Method of releasing gas pipeline section from natural hydrocarbon gas and filling it with nitrogen in preparation for overhaul, as well as removal of nitrogen and filling of section with natural gas after completion of repair works consists in the fact that when natural gas is displaced to the adjacent section of the gas line to separate the volume filled with nitrogen from the volume filled with methane, a device is used—an elastic hollow sphere introduced through an additional nozzle, connected to gas pipeline by means of pressure tapping device, and when gas pipeline section is filled with natural gas reduction of its calorific value caused by nitrogen impurities is compensated by addition of propane vapor to gas line. Device for separation of natural gas and nitrogen volumes in gas pipeline cavity—elastic hollow sphere, has in its structure electric compressor, accumulator, acoustic radiator, inlet and outlet valves, differential pressure sensor, timer, relay, connecting wires, strong flexible shell. For its introduction into gas line and extraction from gas line there are no chambers of pistons start-up and intake.
EFFECT: method of blowing a section of a gas pipeline and a device for its implementation are proposed.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PERFORMING REPAIR WORK AT THE FACILITIES OF THE GAS TRANSMISSION SYSTEM WITHOUT INTERRUPTING THE GAS SUPPLY TO THE CONSUMER | 2023 |
|
RU2805111C1 |
METHOD FOR PERFORMING REPAIR WORKS ON GAS-DISTRIBUTING STATION OF MAIN GAS PIPELINE WITHOUT INTERRUPTION OF GAS SUPPLY TO CONSUMER | 2016 |
|
RU2642905C1 |
METHOD FOR DISPLACING A GAS-AIR MIXTURE THROUGH GAS SAMPLING RISERS AND A DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2796731C1 |
METHOD OF GAS PRESSURE STABILIZATION AT MAIN GAS LINE COMPRESSOR STATION | 2015 |
|
RU2610876C1 |
METHOD FOR EMPTYING GAS PIPELINE SECTION | 2022 |
|
RU2810286C1 |
SYSTEM FOR PUMPING GAS FROM THE COMPRESSOR STATION OF THE MAIN GAS PIPELINE BEING TAKEN OUT FOR REPAIR | 2022 |
|
RU2797503C1 |
METHOD FOR REPAIRMENT OF MAIN GAS PIPELINE AND MOVABLE INSTALLATION FOR ITS IMPLEMENTATION | 2020 |
|
RU2785882C2 |
METHOD OF SELECTING GAS OF STARTING, FUEL, PULSE AND FOR INTERNAL REQUIREMENTS FROM TECHNOLOGICAL COMMUNICATIONS OF COMPRESSOR SCHEMES OF COMPRESSOR STATION AS FUEL FOR DISARMING THE RELATED MACHINE TO REPAIR | 2016 |
|
RU2641770C2 |
METHOD FOR REPAIRING EMERGENCY SECTION OF GAS PIPELINE | 2016 |
|
RU2638895C2 |
METHOD OF GAS DISPLACEMENT FROM A SECTION OF GAS PIPELINE THAT IS BEING PUT TO REPAIR AND SYSTEM FOR ITS IMPLEMENTATION | 2018 |
|
RU2680014C1 |
Authors
Dates
2021-01-22—Published
2018-10-26—Filed