FIELD: coal mining.
SUBSTANCE: invention relates to coal pillars extracting technology, in particular in chamber mining using internal filling. The method includes the following steps: 1) dividing coal pillars during chamber mining into external retained pillars and internal removable pillars, opening a slot on the side of said retained pillars; 2) clearing production of the recoverable pillar through the gap on the retained pillar; 3) closing the gap on the pillar to be left after the completion of the extraction of the recoverable pillar, filling the goaf, surrounded by the whole, cement filling material; 4) support of the overburden strata with cement backfill material after its stabilization instead of the coal pillar, cleaning production of the retained pillar.
EFFECT: higher rate of resource extraction ensured.
5 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF EXTRACTION OF COAL PILLARS DURING CHAMBER DEVELOPMENT BY MEANS OF MONOLITHIC FILLING AND USE OF ARTIFICIAL PILLARS | 2016 |
|
RU2685357C1 |
METHOD OF WELL HYDRAULIC EXTRACTION OF NATURAL RESOURCES | 1990 |
|
RU2023879C1 |
METHOD FOR DEVELOPMENT OF THIN AND VERY THIN COAL BEDS | 2020 |
|
RU2743721C1 |
METHOD FOR OPEN-UNDERGROUND DEVELOPMENT OF FLAT-LYING FORMATIONS | 2019 |
|
RU2715503C1 |
DEVELOPMENT METHOD OF MINERAL RESOURCES AT MINIMUM LOSSES AND MAXIMUM MINE SAFETY | 2010 |
|
RU2428565C1 |
METHOD OF SLANT COAL SEAMS DEVELOPMENT | 1994 |
|
RU2068498C1 |
METHOD TO DEVELOP POTASSIUM BEDS | 2009 |
|
RU2412351C1 |
DEVELOPMENT METHOD OF GENTLY SLOPING AND INCLINED COAL BEDS OF VARIOUS CONFIGURATION AND HYPSOMETRY, WHICH ARE COMPLICATED WITH MINING-AND-GEOLOGICAL INTERRUPTIONS | 2009 |
|
RU2391509C1 |
METHOD FOR CONTROL OF SINKING OF WORKED ROCK AT CHAMBER DEVELOPMENT OF FLAT-LYING POTASSIUM SEAMS | 1996 |
|
RU2103506C1 |
METHOD OF DEVELOPMENT OF STEEPLY PITCHING COAL BEDS AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2553719C1 |
Authors
Dates
2021-03-10—Published
2019-02-22—Filed