FIELD: mining industry. SUBSTANCE: according to method, created are relieving pillars. Occurred in these pillars at deformation is zone of all-round compression. Created as inter-chamber pillars are pillars in which rock at deformation is subjected to dual-axis compression. Chambers are arranged between relieving pillars. EFFECT: high efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MINING OF GENTLY DIPPING POTASSIUM BEDS WITH THIN WATER-PROTECTION MASS | 1995 |
|
RU2098625C1 |
METHOD OF MINING FLAT SEAMS AT ROOF CONTROL ON BAND PILLARS | 1994 |
|
RU2074959C1 |
METHOD OF ROOF CONTROL IN FLAT POTASSIUM SEAMS | 1994 |
|
RU2074960C1 |
STRIP ROOM METHOD OF EXPLOITATION OF POTASSIUM GENTLE-SLOPE BEDS WITH STOWING | 1992 |
|
RU2038477C1 |
METHOD FOR DEVELOPMENT OF ADJACENT FLAT POTASSIUM SEAMS BY NON-COAXIAL CHAMBERS | 1995 |
|
RU2083829C1 |
METHOD FOR CONTROL OF ROCK PRESSURE | 1995 |
|
RU2081316C1 |
METHOD FOR DEVELOPMENT OF FLAT POTASSIUM SEAMS IN CHAMBERS | 1995 |
|
RU2083828C1 |
METHOD FOR CONTROL OF ROCK PRESSURE AT CHAMBER DEVELOPMENT OF FLAT-LYING POTASSIUM SEAMS | 1996 |
|
RU2103505C1 |
METHOD FOR SECONDARY TREATMENT OF SALT BED | 2011 |
|
RU2468206C1 |
METHOD FOR MINING THICK SEAMS OF POTASSIUM-MAGNESIUM SALTS | 1996 |
|
RU2110687C1 |
Authors
Dates
1998-01-27—Published
1996-08-13—Filed