UNDER-RAIL DEVICE OF A RAILWAY TRACK AND A METHOD OF LAYING AT LEAST ONE UNDER-RAIL DEVICE OF A RAILWAY TRACK Russian patent published in 2021 - IPC E01B3/00 E01B3/20 E01B3/46 

Abstract RU 2746554 C1

FIELD: railways.

SUBSTANCE: group of inventions relates to the field of the superstructure of the railway track, in particular to the under-rail devices, as well as to the methods of their laying. The under-rail device contains a sealed shell filled with a viscous working medium. The shell contains inlet and outlet valves. The casing is placed in a housing open at the top. The means for installing rails are located on the upper base plate of the housing. The top plate is mounted on the shell with the possibility of longitudinal and vertical movement. A change in the pressure of the working medium ensures a change in the viscoelastic properties of the shell. When laying the under-rail device on the surface, the body is installed and fixed. A shell is placed in the body, communicated with a source of a viscous working medium by means of a device for regulating the pressure of the medium. An upper support plate is installed on the shell and the pressure in the shell and the position of the stops to align the rail are adjusted.

EFFECT: adjustment of the stiffness of the railway track is provided.

10 cl, 3 dwg

Similar patents RU2746554C1

Title Year Author Number
RAPID-DEPLOYMENT RAILWAY TRACK AND METHOD FOR LEVELLING AND ALIGNING THE GAUGE THEREOF 2022
  • Sychev Viacheslav Petrovich
  • Loktev Aleksei Alekseevich
  • Sycheva Anna Viacheslavovna
  • Chistyi Iurii Antonovich
  • Sychev Petr Viacheslavovich
  • Potapov Andrei Vladimirovich
RU2785239C1
RAILWAY TRACK OF VARIABL STIFFNESS AND METHOD OF ITS FORMATION 2022
  • Sychev Vyacheslav Petrovich
  • Loktev Aleksej Alekseevich
  • Sycheva Anna Vyacheslavovna
  • Sychev Petr Vyacheslavovich
  • Potapov Andrej Vladimirovich
RU2795713C1
METHOD FOR RAPID DEPLOYMENT OF RAILWAY TRACK AND CONSTRUCTION OF SUB-RAIL BASE 2020
  • Sycheva Anna Vyacheslavovna
RU2750544C1
UNDER-RAIL DEVICE AND METHOD FOR PROMPT RESTORATION OF A RAIL THREAD BY LEVEL 2022
  • Sychev Vyacheslav Petrovich
RU2786891C1
METHOD FOR TEMPORARILY RESTORING LEVEL OF RAIL THREAD, DEVICE FOR ITS IMPLEMENTATION, AND METHOD OF ASSEMBLING 2023
  • Sychev Vyacheslav Petrovich
RU2809413C1
RAIL THREAD MODULE AND METHOD OF ITS OPERATIONAL LAYING 2022
  • Sychev Vyacheslav Petrovich
RU2783010C1
RAIL TRACK 1998
  • Ivanov A.M.
  • Potapov S.A.
  • Mukhin M.M.
RU2149936C1
RAILWAY RAIL LENGTH (VERSIONS) 2007
  • Bikbau Jan Marsel'Evich
  • Tsurkan Oleg Nikolaevich
  • Pasechnik Viktor Demidovich
RU2381317C2
RAILWAY TRACK FOR TUNNELS 2006
  • Kravchenko Nikolaj Dmitrievich
  • Kruglov Valerij Mikhajlovich
  • Aksenov Jurij Nikolaevich
  • Bogachev Andrej Jur'Evich
RU2328569C1
MANUFACTURING METHOD AND ARRANGEMENT OF NON-BALLAST RAILWAY TRACK MODULE 2016
  • Karel Teodorus Mariya Gerretsen
RU2630362C1

RU 2 746 554 C1

Authors

Sychev Vyacheslav Petrovich

Loktev Aleksej Alekseevich

Sycheva Anna Vyacheslavovna

Kuznetsova Natalya Vladimirovna

Sychev Petr Vyacheslavovich

Dates

2021-04-15Published

2020-07-22Filed