FIELD: oil and gas industry.
SUBSTANCE: invention relates to the field of the oil and gas industry and can be used in the development of multi-layer hydrocarbon fields. The method for developing multi-layer gas fields includes the construction of well clusters of several vertical, inclined-directional and horizontal wells for different layers of the field. At the same time, wells operating different layers of development have a different spatial profile, gas flow control devices are installed at the wellheads, wells are connected to a single pipeline network and field development begins with the exploitation of lower gas reservoirs with a higher initial reservoir pressure. Upstream reservoirs are included in the development when the current wellhead pressure of wells draining the lower reservoirs decreases to the initial wellhead pressure, and if necessary, by increasing the flow section in the control devices, the gas flow in the wells of formations with higher reservoir pressure is increased without a long wait for a decrease in reservoir pressure in these formations.
EFFECT: invention allows increasing the recovery coefficient of reserves and increasing gas production while simultaneously operating wells with a lower reservoir pressure of formations.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REGULATING VOLUME OF GAS CONDENSATE PRODUCTION IN DEVELOPMENT OF MULTI-LAYER GAS FIELDS | 2020 |
|
RU2761035C1 |
METHOD FOR REGULATING PRESSURE AT INLET TO FIELD DURING DEVELOPMENT OF MULTI-LAYER GAS FIELDS | 2020 |
|
RU2767810C1 |
METHOD OF MULTILAYERED GAS FIELDS PRODUCTION | 2008 |
|
RU2377396C1 |
DEVELOPMENT OF MULTI-ZONE GAS FIELD | 2013 |
|
RU2536523C1 |
METHOD FOR DEVELOPMENT OF MULTI-LAYER DEPOSITS OF NATURAL GASES | 2019 |
|
RU2722190C1 |
METHOD TO OPEN AND DEVELOP MULTIPAY FIELD WITH LOW POROPERM RESERVOIRS | 2014 |
|
RU2560763C1 |
METHOD FOR DEVELOPING MULTI-LAYER GAS DEPOSITS FIELDS WITH LOW-PERMEABILITY RESERVOIRS | 2020 |
|
RU2753334C1 |
PROCEDURE FOR DEVELOPMENT OF MULTI-BED GAS-CONDENSATE DEPOSIT IMPLEMENTING TRANSPORTATION OF GAS VIA HIGH PERMEABLE FORMATION | 2008 |
|
RU2383719C1 |
METHOD FOR EXTRACTION OF CONVENTIONAL AND HYDRATED GAS OF MULTI-FORMATION DEPOSIT AND DEVICE FOR ITS IMPLEMENTATION | 2023 |
|
RU2819884C1 |
METHOD FOR SIMULTANEOUS PRODUCTION OF FLUIDS PRONE TO TEMPERATURE PHASE TRANSITION | 2020 |
|
RU2740884C1 |
Authors
Dates
2021-11-23—Published
2020-12-07—Filed