FIELD: oil-and-gas production.
SUBSTANCE: invention related to oil-and-gas production, can be used for multilayered gas fields development and production. Essence of the invention: method includes construction of production wells separate nets for each production object and pipelines. At that well, producing different production objects, connected to single pipeline. Field development start form lower gas reservoir production, which has bigger primary reservoir pressure, and add upper located reservoirs, when current well-head pressure, draining lower reservoirs, decreases till primary well-head pressure, draining upper reservoirs.
EFFECT: invention provides cost cutting and gas field construction time consumption decrease because of creating single pipeline for product withdrawal.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRACTION OF HYDROCARBON RAW MATERIALS FROM MULTI-LAYER FIELDS | 2020 |
|
RU2760313C1 |
METHOD FOR REGULATING VOLUME OF GAS CONDENSATE PRODUCTION IN DEVELOPMENT OF MULTI-LAYER GAS FIELDS | 2020 |
|
RU2761035C1 |
METHOD FOR REGULATING PRESSURE AT INLET TO FIELD DURING DEVELOPMENT OF MULTI-LAYER GAS FIELDS | 2020 |
|
RU2767810C1 |
METHOD FOR DEVELOPMENT OF MULTI-LAYER DEPOSITS OF NATURAL GASES | 2019 |
|
RU2722190C1 |
DEVELOPMENT OF MULTI-ZONE GAS FIELD | 2013 |
|
RU2536523C1 |
METHOD TO OPEN AND DEVELOP MULTIPAY FIELD WITH LOW POROPERM RESERVOIRS | 2014 |
|
RU2560763C1 |
METHOD FOR DEVELOPING MULTI-LAYER GAS DEPOSITS FIELDS WITH LOW-PERMEABILITY RESERVOIRS | 2020 |
|
RU2753334C1 |
METHOD OF OPERATION OF HYDROCARBON DEPOSIT | 2017 |
|
RU2667210C1 |
METHOD FOR NATURAL GAS PRODUCTION AT LATE STAGE OF FIELD DEVELOPMENT | 2020 |
|
RU2758278C1 |
METHOD FOR CONDUCTING GAS-DYNAMIC STUDIES OF GAS AND GAS CONDENSATE WELLS | 2023 |
|
RU2826995C1 |
Authors
Dates
2009-12-27—Published
2008-09-19—Filed