FIELD: railway transport.
SUBSTANCE: invention relates to the field of railway automation and telemechanics for monitoring the integrity of rail lines. The apparatus comprises a first generator (1) and a first receiver (2), connected in series to both ends of one rail length of the monitored rail line, and a second generator (3) and a second receiver (4) connected in series to another rail length, as well as two independent locomotive receiving coils (5) and an information processing and control apparatus (6), receiving signals about the integrity of each rail length from the first (2) and second (4) receivers.
EFFECT: functional capabilities of the apparatus are expanded.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR CENTRALIZED AUTOMATIC BLOCKING WITH CONTINUOUS RAIL CIRCUITS OF TONE FREQUENCY | 2023 |
|
RU2817647C1 |
TRAIN CONTROL SYSTEM AND TRAIN SEPARATION METHOD IMPLEMENTED IN IT | 2014 |
|
RU2572278C1 |
METHOD FOR INTEGRITY CONTROL OF RAIL THREADS | 2020 |
|
RU2745512C1 |
SYSTEM OF TRAIN SEPARATION AT SPANS | 2012 |
|
RU2503564C1 |
METHOD OF CONTROLLING INTEGRITY OF RAIL THREADS BY THE RATIO OF CURRENT VALUES IN RAILS | 2019 |
|
RU2706607C1 |
SYSTEM FOR TRAIN TRAFFIC REGULATION | 2016 |
|
RU2663564C2 |
STATIONARY TRANSCEIVER, MULTI-PURPOSE GENERATOR AND MULTI-PURPOSE RECEIVER OF TRAIN SPEED ACS | 2009 |
|
RU2400388C1 |
TRACK CIRCUIT | 2006 |
|
RU2328400C1 |
DEVICE FOR DIAGNOSTICS OF ALSN RELAY LOCOMOTIVE EQUIPMENT | 2019 |
|
RU2725829C1 |
SYSTEM TO CONTROL TRAIN TRAFFIC | 2012 |
|
RU2519325C1 |
Authors
Dates
2021-12-24—Published
2021-06-16—Filed