FIELD: control and measuring equipment.
SUBSTANCE: invention relates to control and measuring equipment; it can be used in information and telecommunication systems to ensure the functioning of various control systems. A scale for assessing the awareness of a source of destructive impacts on a structure of a corporate management system, a period of operation of the corporate management system T, about which it is necessary to have an assessment of awareness of the source of destructive impacts on its structure, are additionally set, routing options between nodes of a public communication network in the specified information directions are generated, a routing option for information directions is selected; information directions of the corporate management system passing through each element of the network, and a coefficient of importance of each element of the public communication network for the corporate management system are determined, a variational series of elements of the public communication network is built by the coefficient of importance of its elements, data on implemented destructive impacts on the public communication network is received with an indication of a network element and the time of impact, routes with disrupted information exchange between informationally interconnected subscribers of the corporate management system are corrected after each implemented impact, a variation series of elements of the public communication network is built by a number of implemented destructive impacts, the variation series of elements of the public communication network is corrected by the number of implemented destructive impacts after each implemented impact; the variational series of elements of the public communication network is compared by the number of implemented destructive impacts with the variational series of elements of the public communication network by the coefficient of importance of its elements based on the results of impacts over time T, and awareness of the source of destructive impacts on the structure of the corporate management system is assessed.
EFFECT: increase in the reliability of the assessment of awareness of the source of destructive impacts on the structure of the corporate management system due to consistently and reasonably taking into account, when assessing, the importance of information directions of the corporate management system routed in the public communication network, and the distribution of destructive impacts on elements of this network.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MODELING VIRTUAL COMMUNICATION NETWORK ON REMAINING RESOURCES OF PHYSICAL NETWORK | 2020 |
|
RU2749444C1 |
METHOD FOR INCREASING STABILITY OF VIRTUAL COMMUNICATION NETWORK OF CORPORATE CONTROL SYSTEM | 2020 |
|
RU2750950C1 |
METHOD FOR MODELING THE CONNECTION OF MOBILE ELEMENTS OF A CORPORATE MANAGEMENT SYSTEM TO A FIXED COMMUNICATION NETWORK | 2020 |
|
RU2746670C1 |
METHOD FOR TRANSFORMING THE INITIAL PHYSICAL STRUCTURE OF A COMMUNICATION NETWORK TO INCREASE THE STABILITY OF THE PRESENTATION OF INFORMATION RESOURCES TO THE MANAGEMENT BODIES OF THE CORPORATE MANAGEMENT SYSTEM | 2022 |
|
RU2788672C1 |
METHOD FOR STABLE DATA ROUTING IN A VIRTUAL COMMUNICATION NETWORK | 2021 |
|
RU2757781C1 |
METHOD FOR PROACTIVE RECONFIGURATION OF COMMUNICATION NETWORK STRUCTURE PROVIDING INFORMATION EXCHANGE IN INTERESTS OF CORPORATE MANAGEMENT SYSTEM UNDER CONDITIONS OF DESTRUCTIVE INFLUENCE | 2020 |
|
RU2747174C1 |
METHOD OF INCREASING STABILITY OF A COMMUNICATION NETWORK WITH MEMORY | 2020 |
|
RU2734103C1 |
METHOD FOR PRELIMINARY TARGETED RECONFIGURATION OF THE COMMUNICATION NETWORK, TAKING INTO ACCOUNT THE ASSESSMENT OF THE AWARENESS OF THE SOURCE OF INFORMATION AND TECHNICAL IMPACTS ON THE STRUCTURE OF THE COMMUNICATION NETWORK | 2021 |
|
RU2754271C1 |
METHOD FOR ENSURING COVERTNESS OF OPERATION OF ELEMENTS OF A COMMUNICATION SYSTEM UTILISING THE RESOURCES OF A PUBLIC COMMUNICATION NETWORK | 2021 |
|
RU2772548C1 |
METHOD FOR DATA TRANSMISSION IN COMMUNICATION NETWORKS WITH UNSTABLE CHARACTERISTICS OF ELEMENTS | 2020 |
|
RU2747092C1 |
Authors
Dates
2022-01-17—Published
2020-07-15—Filed