FIELD: electrical and thermal energy production.
SUBSTANCE: invention relates to means for the production of electrical and thermal energy using geological formations with sufficient thermal potential and high occurrence. In the heating cavity, a detonation device for the explosive mixture supplied to the heating cavity together with the coolant is installed. The coolant supply and discharge wells are made with a margin of safety, ensuring their stability from the destructive effect of excess pressure of a shock wave during a controlled explosion of an explosive mixture with the possibility of controlled seismic impact on geological formations, preventing the accumulation of electric potential in the formation and improving the microcirculation of the coolant in the heating cavity. The building structure of the power plant building, wells for supplying coolant and wells for removing coolant are made thermally insulated and electrically insulated.
EFFECT: increasing the level of safety in the operation of a petrothermal power plant.
6 cl, 1 dwg
Authors
Dates
2022-06-21—Published
2021-12-07—Filed