FIELD: construction.
SUBSTANCE: invention relates to the field of construction and can be used in the construction of the roadbed of various types of roads. Initially, curbs are installed on the sides of the road surface under construction, which form the width of the road, their lower ends are deepened below ground level. Then, soil is selected inside the curbs along the area of the road under construction, and a sandy base is formed in the formed working. Reinforced concrete blocks with prismatic elements on the lower surfaces are laid in rows on a sandy base. Each reinforced concrete block in a row is installed from the end of the next block in the same row at a distance of half the length of the reinforced concrete block. After laying all the blocks, the free space between the blocks is covered with filler, for example, river sand. The working depth and the thickness of the sandy base are formed taking into account the location of the upper surfaces of the reinforced concrete blocks below the level of the upper ends of the curbs, and on the outer side of the curbs, a backfill is created from the upper edge of the curb to the ground surface.
EFFECT: reducing the material consumption of the road surface, increasing the speed of construction of various types of roads, as well as increasing the reliability of fixing and stability of reinforced concrete blocks in the roadway.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTING A PARKING LOT FOR MACHINERY WITH A COATING BASED ON REINFORCED CONCRETE BLOCKS WITH PRISM-SHAPED ELEMENTS ON THE LOWER SURFACES | 2021 |
|
RU2777018C1 |
CANVAS OF CONCRETE BLOCKS | 2020 |
|
RU2740277C1 |
FLEXIBLE WEB OF CONCRETE BLOCKS | 2020 |
|
RU2739775C1 |
ROLL BED FOR TEMPORARY ROADS AND PARKING FACILITIES | 2020 |
|
RU2740959C1 |
FLEXIBLE MAT FOR QUICKLY ERECTED COATINGS | 2020 |
|
RU2740278C1 |
0 |
|
SU1784706A1 | |
METHOD FOR DRAINAGE EQUIPMENT OF ROADS | 2021 |
|
RU2764407C1 |
METHOD TO ERECT DIKE DAM ON ARCTIC SEA SHORE | 2011 |
|
RU2453653C1 |
ROAD PAVING CONSTRUCTION METHOD | 0 |
|
SU1477804A1 |
METHOD OF PAVEMENT FORMATION | 1997 |
|
RU2122058C1 |
Authors
Dates
2022-08-08—Published
2021-12-28—Filed