FIELD: hydraulic engineering.
SUBSTANCE: device for blocking the bed of a small river is made in the form of a dam made of bulk soil, placed between two rows of frame fencing panels, while the fence is made in the form of spatial structure 1, in which the frame panels are made of metal, their rows are located at a distance of 2-4 meters from each other and connected to each other by cross-links 2. On the panels of each row, anchors in the form of anchor piles 3 are installed with the ability to move in a vertical plane relative to the panels. On the outer side of the row of panels, facing the upstream, at least one perforated pipe 5 is fixed vertically, to the full height of the metal panels, into which the suction pipeline of the water pump is freely inserted for pumping water from the upstream. On the outside of the row of panels, facing the downstream, suction line 9 of the ejector pump is installed with the possibility of vertical movement, which is structurally connected to the pressure pipeline of the water pump for pumping water from the upstream. All the pumping equipment is mounted on platform 11, installed in the upper part of the spatial structure of the dam. It is advisable to provide an automatic shutdown for the ejector pump when water is completely pumped out from the tailwater.
EFFECT: quick installation of the dam, acceleration of preparatory work, preservation of the current river flow by pumping the flow with a water (blade) pump while simultaneously pumping out the water volume with an ejector pump from the tailwater isolated by the dam, leaving the river bottom open to remove bottom sediments and clear the river of blockages solid inclusions, household waste and fallen trees.
2 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CLEARING SILTED AND CLOGGED BEDS OF SMALL URBAN RIVERS WITH LIMITED ACCESS TO THE RIVER BED | 2022 |
|
RU2803804C1 |
METHOD OF PURIFICATION AND RESTORATION OF BIOLOGICAL PONDS OF PURIFICATION PLANTS | 2007 |
|
RU2338832C1 |
EARTH DAM STRUCTURE AND BUILDING METHOD | 0 |
|
SU1693176A1 |
WATER INTAKE STRUCTURE FOR RECEIVING WATER FROM MOUNTAIN AND FOOTHILL RIVERS FOR SMALL HPP | 2018 |
|
RU2694189C2 |
TRANSITION OF PIPELINE THROUGH WATER OBSTACLE | 2015 |
|
RU2590930C1 |
METHOD FOR REGULATING WATER FLOW IN RIVER CHANNELS FOR PREVENTING FLOODS | 2017 |
|
RU2683224C1 |
METHOD OF HYDRAULIC DREDGER OPERATION | 2016 |
|
RU2626076C1 |
FLOATING GATE | 2008 |
|
RU2379417C1 |
METHOD OF CREATING SEASONAL WATER STORAGE ON RIVERS WITH UNSTABLE WATER LEVEL AND DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2684562C1 |
FAST-ERECTED RIVER DAM WITH POSSIBILITY OF PASSAGE OF COMMENSURATE VESSELS | 2019 |
|
RU2703782C1 |
Authors
Dates
2023-10-16—Published
2023-04-03—Filed