FIELD: bridge construction.
SUBSTANCE: method for securing a floating section of a road bridge. The mooring poles are made of carbon fibre tubular shells with a diameter of up to 1 m, which are immersed in the bottom soil to a depth of at least 4 m. The poles are located in pairs near the upstream and the downstream sides of the floating section, but beyond its longitudinal overall boundaries. In the walls of the shells of all the poles, during their manufacture, one vertical slot is made from top to bottom, which ends 3-4 meters from its lower end. After immersion, sealed floats made of carbon fibre pipes are placed in the shells. Perpendicular to the surface of each float, during its manufacture, a flat holder for the ends of the guy lines is rigidly attached, in which there is one hole for a detachable suspension, to which the ends of the guys from a certain number of the universal floating system links are attached. The holders move along the slots in the shells of the bollards, rising or falling together with the floats and guys from the floating section, which ensures a constant position in the same place in the plan on the combined road bridge axis. At the upper ends of the shells of all the poles, removable hoops are placed and bolted, providing rigidity to the above-ground parts of the poles.
EFFECT: constant, unchanged position along the axis of the bridge, regardless of changes in the level of water in the river and of the roadway of the floating section when vehicles move along it.
1 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
INSTALLATION OF UNDERWATER ROAD DEMOUNTABLE BRIDGE IN DESIGN POSITION OF SUPERSTRUCTURE WITH ONE INTERMEDIATE PILE-SHOE SUPPORT | 2019 |
|
RU2737748C1 |
METHOD FOR JOINING COASTAL AND RIVER PARTS OF FLOATING UNIFIED RAILWAY RIBBON BRIDGE MLZH-VF-VT | 2020 |
|
RU2750370C1 |
METHOD OF BANK COMPENSATION FOR INVENTORY SURFACING RAILWAY BRIDGE AT HIGH SPEED OF RIVER FLOW | 2020 |
|
RU2739543C1 |
FLOATING ROAD BRIDGE | 2023 |
|
RU2825359C1 |
METHOD FOR CREATION OF RIVER PART OF CONTINUOUS FLOATING RAILWAY BRIDGE | 2018 |
|
RU2716629C1 |
METHOD FOR DOCKING OF RIVER PARTS OF FLOATING BRIDGES MLZH-VF-VT AND NZHM-56 | 2018 |
|
RU2692363C1 |
MODULAR METAL KNIFE-EDGE TELESCOPIC ICE CUTTER | 2022 |
|
RU2807000C1 |
UNIVERSAL DISMOUNTABLE ICE CUTTER | 2020 |
|
RU2746339C1 |
FLOATING RAILWAY BRIDGE | 2021 |
|
RU2755794C1 |
AEROGYDRODYNAMIC KEY BUOY AND METHOD OF CROPPING OF SURFACE OBJECTS OF FISHING | 2016 |
|
RU2641898C1 |
Authors
Dates
2023-11-08—Published
2022-10-21—Filed