FIELD: mining; measurement.
SUBSTANCE: invention relates to exploration of production wells. Method of controlling development of multi-formation gas deposit involves lowering pressure and temperature sensors into annular space of production wells of the deposit and their connection by means of cables to measuring inputs of individual telemetric system for measuring thermobaric parameters along the shaft of tubing strings, which are equipped with wells of the field. Telemetry system is used to continuously measure pressure and temperature in the tubular and annular space. GSM modem is used to transmit the obtained data to a remote control information system. Further, their automated processing, interpretation, three-dimensional geological-hydrodynamic and thermal modelling of the state of wells of the field to determine the gas-saturated thickness of the formation involved in the drainage by the change in pressure and temperature in the reacting wells, to determine the area of distribution of the formation involved in the drainage, reduction of temperature and pressure as a whole for formations and performance of quantitative assessment of degree of involvement of one or another part of deposit in development, as well as determination of optimal mode of well operation in mode of single gas gathering network, determination of hydraulic losses along tubing string of each well and determination of hydrate mode of operation of each well.
EFFECT: higher accuracy of control over development of multi-formation gas deposit.
3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT OF MULTI-ZONE GAS FIELD | 2013 |
|
RU2536523C1 |
METHOD FOR CONTROL OF GAS PRODUCTION IN A MULTILAYER FIELD AND A SYSTEM FOR ITS IMPLEMENTATION | 2022 |
|
RU2798646C1 |
DEVELOPMENT METHOD OF MULTIPAY FIELDS OF CARBONS WITH HETEROGENEOUS GEOLOGICAL CONDITIONS OF BEDDING OF PRODUCING FORMATIONS AND LAYOUT OF DOWNHOLE AND CONTROL HEAD EQUIPMENT FOR ITS IMPLEMENTATION | 2008 |
|
RU2386017C1 |
METHOD FOR EXTRACTION OF CONVENTIONAL AND HYDRATED GAS OF MULTI-FORMATION DEPOSIT AND DEVICE FOR ITS IMPLEMENTATION | 2023 |
|
RU2819884C1 |
METHOD FOR DUAL OPERATION OF OIL WELL EQUIPPED WITH ELECTRIC-CENTRIFUGAL PUMP | 2013 |
|
RU2533468C1 |
HYDROCARBON MATERIAL EXTRACTION CONTROL SYSTEM | 2007 |
|
RU2346156C1 |
METHOD FOR REGULATING PRESSURE AT INLET TO FIELD DURING DEVELOPMENT OF MULTI-LAYER GAS FIELDS | 2020 |
|
RU2767810C1 |
PROCEDURE FOR DEVELOPMENT OF GAS-HYDRATES DEPOSITS | 2010 |
|
RU2438009C1 |
DIFFICULT TURONIAN GAS PRODUCTION METHOD | 2020 |
|
RU2743478C1 |
METHOD TO OPEN AND DEVELOP MULTIPAY FIELD WITH LOW POROPERM RESERVOIRS | 2014 |
|
RU2560763C1 |
Authors
Dates
2024-05-07—Published
2023-08-29—Filed