METHOD OF MOUNTING BORED CAST IN-SITU REINFORCED CONCRETE PILES Russian patent published in 2024 - IPC E02D5/34 

Abstract RU 2820641 C1

FIELD: construction.

SUBSTANCE: method of erection of bored cast in-situ reinforced concrete piles using Yutkin electrohydro-impact effect and device for its implementation, relates to construction, more precisely to methods of erection of bored cast in-situ piles in soil. Method of installation of bored cast in-situ reinforced concrete pile in soil includes preparation of well in soil, installation of reinforcing frame and pouring of concrete mixture. Reinforcing carcass is assembled on drilling pipe with length required for bored pile submersion to design depth. Electrohydraulic device consisting of a central fixed quick-release positive contact and a negative contact is installed in the lower part of the drilling pipe. After the assembly is completed, the casing is put on the reinforcing carcass, fixed by the stoppers, which are structurally made integral with the clamps, which have holders that are in a folded position pre-installed on the drilling pipe for reliable fixation, and assembled structure in vertical position is installed on place of installation of bored cast in-situ pile in pit filled with water. Water is supplied to the electrohydraulic device and the current pulse generator is switched on, as a result of which the electrohydraulic device together with the reinforcing carcass and the casing pipe is immersed into the formed cavity. After submersion of the electrohydraulic device to a depth less than the specified one by 1-0.5 meters, water supply is replaced with concrete solution supply via drilling pipe; at that, in order to form a bulge at the end of bored cast in-situ pile, power and frequency of discharge are increased at last 1-0.5 meters before the specified depth of its immersion. Entire cavity formed behind the electrohydraulic device descending into the soil is filled with a concrete solution to form a concrete column with a reinforcing frame in the form of a bored cast in-situ pile inside it. After the reinforcement carcass with the casing pipe reaches the design depth, the reinforcement cage is shifted downwards, the casing pipe is released, the drilling pipe with an electrohydraulic device is removed from the concrete solution of the finished bored cast in-situ pile.

EFFECT: efficient extraction of electrohydraulic device from preset depth after reinforcement carcass with casing is submerged to preset depth.

1 cl, 8 dwg, 1 tbl

Similar patents RU2820641C1

Title Year Author Number
METHOD FOR ARRANGEMENT OF BORED PILES PACKET 2007
  • Lazarev Aleksandr Nikolaevich
  • Savchuk Aleksandr Dmitrievich
  • Vlasov Vladimir Nikolaevich
RU2352719C1
BORED PILE WITH WIDENING 2023
  • Fomenko Nikolai Aleksandrovich
  • Abramian Susanna Grantovna
  • Oganesian Oganes Valerevich
  • Fomenko Vladislav Nikolaevich
RU2824059C1
METHOD FOR CONSTRUCTION OF BORED PILE WITHOUT CASING PIPE 2024
  • Bukato Igor Vitalevich
  • Iarovoi Maksim Borisovich
  • Golubev Vladimir Iurevich
  • Anisimov Maksim Anatolevich
RU2822841C1
DRILL STRING FOR ERECTION OF BORED PILE IN SOIL-CEMENT CLADDING 2019
  • Mikhajlov Aleksandr Nikolaevich
  • Pushkarev Aleksandr Evgenevich
  • Sokolov Nikolaj Sergeevich
  • Sokolov Sergej Nikolaevich
  • Sokolov Andrej Nikolaevich
RU2735077C1
METHOD OF SETTING UP BORED PILES 2018
  • Bojtsov Dmitrij Anatolevich
  • Samosudov Vladimir Georgievich
  • Kostenko Bogdan Valerevich
  • Kholina Elvira Andreevna
RU2676339C1
REINFORCED CONCRETE DRILLING PILE AND METHOD OF ITS ERECTION 2016
  • Yurkevich Pavel Borisovich
RU2657885C2
METHOD FOR PRODUCTION OF BORE PILE 2015
  • Diashev Aleksandr Nikolaevich
  • Ivankov Sergej Viktorovich
  • Mordvintsev Konstantin Petrovich
  • Popelnyukhov Sergej Nikolaevich
  • Yurev Boris Vladimirovich
RU2596170C1
METHOD FOR CONSTRUCTING BORED PILE IN SOIL 2023
  • Frolov Vadim Eduardovich
  • Bondarevskij Aleksej Vladimirovich
  • Brovikov Yurij Nikolaevich
  • Kolesnikov Aleksej Yurevich
  • Bojkov Evgenij Vasilevich
RU2804651C1
BORED PILE 2023
  • Fomenko Nikolai Aleksandrovich
  • Abramian Susanna Grantovna
  • Oganesian Oganes Valerevich
  • Fomenko Vladislav Nikolaevich
RU2824116C1
METHOD OF AUGER PILES INSTALLATION 2015
  • Lubjagin Aleksandr Vasil'Evich
  • Bobrjakov Al'Bert Pavlovich
  • Annamatov Annamat Mallaevich
RU2575190C1

RU 2 820 641 C1

Authors

Gorbashov Vladimir Nikolaevich

Dates

2024-06-07Published

2023-09-15Filed