METHOD OF DETERMINING SHORT CIRCUIT POINT IN TRACTION NETWORK OF SYSTEM 2*25 kV OF RAILWAY Russian patent published in 2024 - IPC G01R31/08 

Abstract RU 2821157 C1

FIELD: electric power industry.

SUBSTANCE: invention relates to electric power engineering and can be used for determination of short circuit point in railway overhead system. In case of short circuit, values of complex voltages on buses of supply substations and currents in wires of contact system are measured and recorded. Contact system model is divided into equal sections, for example from support to support. Values of measured at short circuit voltage on buses and currents in wires from two ends of contact system are obtained from oscillograms of digital recorders of emergency processes. Voltages at short circuit are generated and stored at the end of each section in each wire, starting from buses from one and the other ends of the contact system. Modules and voltage angles are selected at the end of each section in each wire, starting from buses from one and the other ends of the line. Modules and angles of stresses at short circuit are used to plot graphs with axes on both sides of dependencies of modules and angles of stresses on the number of the section (on the distance). Point of intersection of graphs from one and the other ends of the contact system corresponds to the point of short circuit.

EFFECT: increasing the accuracy of determining the location of damage by taking into account the values of the impedance of wires and the inter-wire longitudinal and transverse resistance of the wires of the contact network, taking into account the load values of electric rolling stock and the parameters of equivalent circuits of autotransformers.

1 cl

Similar patents RU2821157C1

Title Year Author Number
METHOD OF DETERMINING LOCATION OF SHORT CIRCUIT AT LONG POWER LINE WITH SPUR LINE 2015
  • Tiguntsev Stepan Georgievich
RU2593409C1
METHOD FOR DETERMINATION OF SHORT CIRCUIT SPOT ON LONG POWER TRANSMISSION LINE WITH ADJUSTMENT OF LINE CHARACTERISTIC 2016
  • Tiguntsev Stepan Georgievich
RU2637716C1
METHOD FOR DETERMINING LOCATION OF SHORT CIRCUIT WITH SIMULTANEOUS BREAK OF WIRE AT OVERHEAD TRANSMISSION LINE 2015
  • Tiguntsev Stepan Georgievich
RU2593407C1
METHOD OF DETERMINING LOCATION OF SHORT CIRCUIT AT LONG POWER LINE OF VOLTAGE 220 KV AND HIGHER 2015
  • Tiguntsev Stepan Georgievich
RU2586438C1
METHOD OF DETERMINING THE SHORT CIRCUIT SPOT ON MULTI-CHAIN WITH EARTH-WIRES, GROUNDED AT ANCHOR SUPPORTS, THREE-PHASE ELECTRIC TRANSMISSION AIR-LINE WITH DISTRIBUTED PARAMETERS 2016
  • Tiguntsev Stepan Georgievich
RU2615150C1
METHOD FOR DETERMINING PLACE OF DAMAGE IN AIR AND CABLE LINES OF POWER TRANSMISSION IN NETWORKS WITH INSULATED NEUTRAL 2013
  • Tiguntsev Stepan Georgievich
RU2539830C2
METHOD OF DETERMINING THE SHORT CIRCUIT SPOT ON MULTI-CHAIN WITH EARTH-WIRES, GROUNDED AT ANCHOR SUPPORTS, THREE-PHASE ELECTRIC TRANSMISSION AIR-LINE WITH DISTRIBUTED PARAMETERS 2015
  • Tiguntsev Stepan Georgievich
RU2623180C1
METHOD OF DETERMINING SHORT-SHORT LOCATION IN OVERHEAD POWER LINE WITH DISTRIBUTED PARAMETERS 2015
  • Tiguntsev Stepan Georgievich
RU2620193C1
METHOD OF DETERMINING POINT OF WIRE BREAKAGE ON OVERHEAD TRANSMISSION LINE 2015
  • Tiguntsev Stepan Georgievich
RU2593405C1
METHOD FOR REMOTE DETERMINATION OF SHORT-CIRCUIT PLACE ON POWER TRANSMISSION LINE 2019
  • Lebedev Vladimir Dmitrievich
  • Filatova Galina Andreevna
  • Yablokov Andrej Anatolevich
  • Ivanov Igor Evgenevich
  • Lebedeva Nataliya Vladimirovna
RU2731657C1

RU 2 821 157 C1

Authors

Tiguntsev Stepan Georgievich

Esaulov Aleksei Vladimirovich

Dates

2024-06-17Published

2024-03-21Filed