FIELD: gas industry.
SUBSTANCE: adsorption plant for cleaning hydrocarbon gas includes a control valve, an inlet separator, adsorbers, top of which is connected to initial gas supply line, cooling gas supply line and regeneration saturated gas discharge line, bottom is connected with prepared gas, cooling gas discharge line and regeneration gas supply line, filtering device, furnace, high pressure separator connected in series with medium and low pressure separators. Initial gas feed line passes through control valve and is connected to inlet separator. Gas outlet from the inlet separator is connected to the first recuperative heat exchanger. Cooling gas supply line is connected to the initial gas supply line before the control valve and is connected to the separator filter. Cooling gas discharge line is connected in series to the second filtering device, the second recuperative heat exchanger and the furnace. Regeneration saturated gas discharge line is connected in series to the third filtering device, the second recuperative heat exchanger, the first recuperative heat exchanger, a propane cooler and a high-pressure separator. Gas condensate discharge line from high-pressure separator is connected to medium pressure separator via throttle. Methanol recovery unit is connected to process water discharge line, and the outlet is connected through the regenerated methanol supply line to the regenerated saturated gas line between the first recuperative heat exchanger and the propane cooler and contains the interconnected inlet recuperative heat exchanger, the outlet from which is connected to the middle part of the rectification column. Upper part of the column is interconnected with the air cooler, the reflux tank and the first pump. Lower part of the fractionation column is connected in series to the reboiler, the second pump and the inlet heat exchanger through the process water discharge line. On the hydrocarbon gas purification adsorption unit, a silica gel processing unit is additionally installed, the inputs of which are connected to the used silica gel loading line, with fuel gas discharge line from medium pressure fuel network, with process water discharge line from high pressure separator and with prepared gas part line, which is connected to prepared gas line through throttle. Outputs are connected to the line of discharge of the mixture of processed silica gel and high-carbon material from the installation, to the discharge line of pyrolysis gas, which is connected to the low-pressure fuel network and to the line of the cooled part of the prepared gas, which is connected through the gas filter to the low-pressure fuel network and to the outlet to the consumer.
EFFECT: invention enables to ensure environmental safety, provide the possibility of resource saving of the installation and obtaining an additional amount of stable condensate and fuel gas, as well as an additional amount of hydrocarbon products: pyrolysis gas, pyrolysis condensate and a mixture of processed silica gel and high-carbon material.
1 cl, 3 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
NATURAL GAS PURIFICATION ADSORPTION UNIT | 2023 |
|
RU2821526C1 |
HYDROCARBON GAS PREPARATION PLANT | 2023 |
|
RU2814922C1 |
ADSORPTION UNIT FOR PREPARATION OF HYDROCARBON GAS | 2019 |
|
RU2714651C1 |
GAS TREATMENT PLANT FOR TRANSPORTATION | 2019 |
|
RU2714807C1 |
NATURAL GAS TREATMENT PLANT | 2021 |
|
RU2765821C1 |
INSTALLATION FOR THE PREPARATION OF HYDROCARBON GAS | 2021 |
|
RU2762392C1 |
NATURAL GAS ADSORPTION DRYING AND STRIPPING UNIT | 2022 |
|
RU2803501C1 |
INTEGRATED HYDROCARBON GAS TREATMENT PLANT | 2022 |
|
RU2813542C2 |
ADSORPTION INSTALLATION FOR NATURAL GAS PREPARATION AND TRANSPORTATION | 2021 |
|
RU2791272C1 |
INTEGRATED NATURAL GAS TREATMENT PLANT | 2022 |
|
RU2813543C2 |
Authors
Dates
2024-06-25—Published
2023-12-26—Filed