FIELD: construction.
SUBSTANCE: invention relates to construction and can be used in formation of large-span monolithic reinforced concrete floors of residential and industrial buildings. Method of pre-stressing of frame-support system of monolithic reinforced concrete floor includes assembly of spacer and thrust pre-stressed crossbars into frame, which are connected to each other by means of embedded parts. Holes are pre-made in thrust beams, into which reinforcing bars are installed parallel to spacer beams. Then reinforcing bars are pulled on thrust beams and their ends are fixed with anchors.
EFFECT: absence of transfer of forces to load-carrying enclosing structures (walls, columns) of the building, reduction of reinforcement consumption and increase of load-carrying capacity of the floor.
1 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
PRECAST-MONOLITHIC REINFORCED CONCRETE FRAME OF MULTI-STOREY BUILDING | 2020 |
|
RU2755669C1 |
MULTISTOREY BUILDING FRAME | 2002 |
|
RU2233952C1 |
COMPOSITE REINFORCED CONCRETE FRAME FOR MULTISTORY BUILDING | 2003 |
|
RU2250966C2 |
PRESTRESSED HOLLOW-CORE REINFORCED CONCRETE SLAB FOR CEILING DISKS | 2007 |
|
RU2338851C1 |
CONSTRUCTION WITH MEMBRANE-PNEUMATIC COATING | 2020 |
|
RU2757438C1 |
GIRDERLESS FRAME OF PRECAST MONOLITHIC REINFORCED CONCRETE (VERSIONS) | 2015 |
|
RU2588229C1 |
PREFABRICATED MONOLITHIC REINFORCED CONCRETE FRAME OF THE BUILDING | 2021 |
|
RU2778227C1 |
METHOD TO MANUFACTURE SLABS IN WOODEN LOW-RISE BUILDINGS | 2011 |
|
RU2478763C1 |
PREFABRICATED REINFORCED CONCRETE FRAME OF MULTISTORY BUILDING OF HIGHER FIRE RESISTANCE | 2009 |
|
RU2411328C1 |
STRUCTURAL SYSTEM OF MULTISTORY BUILDING AND PROCESS OF ITS ERECTION ( VARIANTS ) | 2000 |
|
RU2197578C2 |
Authors
Dates
2025-03-03—Published
2024-07-30—Filed