FIELD: mining.
SUBSTANCE: method of initial filling of underground reservoir in deposits of soluble rocks, which includes pumping of gas through process well into underground reservoir with simultaneous displacement of brine through the well, is characterized by cyclic operation of gas compressor. Between cycles of compressor operation, replacement of brine is performed by energy of gas compressed in underground reservoir. At the initial stage of gas injection, a gas cushion is created, which ensures stable operation of the gas pumping unit. After creation of gas cushion gas injection with displacement of brine is carried out in stages. At each pumping stage the maximum allowable gas pressure in the underground reservoir is achieved. Value of this pressure is determined from the condition of hydraulic fracturing of rocks. Between the pumping stages the extraction of brine from the process well is continued till the minimum permissible value of gas pressure in the underground reservoir. Value of the minimum allowable pressure is determined from the condition of ensuring continuity of brine extraction. Cycles are repeated until complete replacement of brine with gas.
EFFECT: this method of operation provides considerable reduction of power consumption.
3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF UNDERGROUND RESERVOIR INITIAL FILLING WITH GAS IN ROCK SALT | 2024 |
|
RU2839335C1 |
METHOD FOR OPERATION OF UNDERGROUND STORAGE OF HIGH-VISCOSITY OIL PRODUCTS | 1990 |
|
RU2093444C1 |
PROCEDURE FOR INCREASING PAYLOAD VOLUME OF UNDERGROUND RESERVOIR FORMED IN SOLUBLE ROCK VIA BORE WELL | 2007 |
|
RU2384505C2 |
METHOD OF CREATION AND OPERATION OF UNDERGROUND GAS STORAGE IN DEPOSITS OF ROCK SALT | 2018 |
|
RU2707478C1 |
METHOD OF DELIVERY OF GASEOUS NON-SOLVENT AT ERECTION OF UNDERGROUND RESERVOIRS IN SOLUBLE ROCK | 1997 |
|
RU2141440C1 |
METHOD FOR ELIMINATION OF UNDERGROUND RESERVOIRS OF FORMATION HYDROCARBON RAW MATERIAL WITH RESERVOIRS CONSTRUCTED IN ROCK SALT AND OTHER ROCKS, INCLUDING PERMAFROST, AS WELL AS IN NATURAL FORMING KARSTIC CAVITIES | 2018 |
|
RU2746918C2 |
METHOD OF CAVING THE INSOLUBLE ROCK PARTING IN CONSTRUCTION OF UNDERGROUND RESERVOIR IN SOLUBLE SALTS THROUGH BOREHOLE | 1998 |
|
RU2166081C2 |
METHOD OF OPERATION OF UNDERGROUND GAS STORAGES IN SOLUBLE ROCK DEPOSITS | 2001 |
|
RU2211179C1 |
METHOD FOR CONSTRUCTING DOUBLE-DECK UNDERGROUND RESERVOIR IN ROCK SALT LAYER | 2023 |
|
RU2812756C1 |
SYSTEM AND METHOD OF OPERATING UNDERGROUND GAS STORAGE FACILITIES | 2022 |
|
RU2804039C1 |
Authors
Dates
2025-04-04—Published
2024-09-06—Filed