FIELD: erection of underground reservoirs by geotechnological methods in soluble rocks, in rock salt deposits. SUBSTANCE: non-solvent is ejected and is compressed in stage by active flow of high-pressure gas. Gas is preliminarily pumped into well. At final stage of compression, pressure sufficient for mixing with solvent is obtained. Mixture is pumped into reservoir erected through well. EFFECT: improved technology of delivery of gaseous non-solvent; reduced expenses for realization of this method. 3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR CONSTRUCTION OF UNDERGROUND RESERVOIR IN SOLUBLE FORMATIONS | 1993 |
|
RU2041143C1 |
METHOD FOR BUILDING UNDERGROUND RESERVOIR IN DEPOSITS OF ROCK SALT | 1991 |
|
RU2068806C1 |
METHOD FOR OPERATION OF UNDERGROUND STORAGE OF HIGH-VISCOSITY OIL PRODUCTS | 1990 |
|
RU2093444C1 |
DEVICE FOR BUILDING UNDERGROUND RESERVOIRS HAVING PREDETERMINED CONFIGURATION IN MINE SALT | 0 |
|
SU1792893A1 |
METHOD OF AND DEVICE FOR CONSTRUCTION OF TANKS IN ROCK SALT | 2001 |
|
RU2213033C2 |
METHOD FOR CREATING UNDERGROUND RESERVOIRS IN ROCK SALT FORMATIONS AND UNDERGROUND RESERVOIR DESIGNS FOR IMPLEMENTING THE SAME | 1991 |
|
RU2068805C1 |
METHOD OF CREATING UNDERGROUND STORAGE IN SOLUBLE ROCKS | 2004 |
|
RU2256596C1 |
METHOD FOR UNDERGROUND RESERVOIR BUILDING IN ROCK SALT | 2003 |
|
RU2264965C2 |
METHOD FOR UNDERGROUND TUNNEL RESERVOIR BUILDING IN ROCK SALT BED HAVING LIMITED THICKNESS | 2004 |
|
RU2258652C1 |
METHOD FOR CONSTRUCTION OF UNDERGROUND VESSEL IN DEPOSITS OF ROCK SALT | 1997 |
|
RU2118606C1 |
Authors
Dates
1999-11-20—Published
1997-08-26—Filed