FIELD: oil and gas production industry. SUBSTANCE: this relates to oil production by using heat generated in result of burning hydrocarbons at place of their deposition. High efficiency of process is achieved due to reduced power consumption in developing deposits with natural gas cap without burning of upper part of gas cap. According to method, burning in gas cap is initiated by delivery of oxidizing agent with subsequent cyclic delivery of gas-air mixture into burnt-out part of gas cap. Burning site is created at distance from gas-oil contact to prevent bursting of gas and combustion products into oil-saturated part of reservoir. Oil and gas are taken simultaneously through producing wells. Calculations show that distance from burning site in gas cap to gas-oil contact is 120-150 m. EFFECT: high efficiency.
Title | Year | Author | Number |
---|---|---|---|
GAS-OIL DEPOSITION WITH SMALL WATER-FLOATING OIL CONTOURING | 1986 |
|
SU1410596A1 |
METHOD OF EXPLOITATION OF GAS-OIL POOLS | 1992 |
|
RU2027848C1 |
METHOD FOR DEVELOPMENT OF OIL RIM OF OIL AND GAS CONDENSATE RESERVOIR | 2010 |
|
RU2433253C1 |
METHOD OF OIL POOL DEVELOPMENT WITH GAS CAP AND BOTTOM WATER | 2008 |
|
RU2386804C1 |
METHOD OF DEVELOPMENT OF OIL FRINGE AND UNDER-GAZ ZONE OF COMPLEX DEPOSITS | 2015 |
|
RU2606740C1 |
METHOD OF DEVELOPMENT OF HYDROCARBON DEPOSIT | 2007 |
|
RU2334870C1 |
METHOD FOR DEVELOPMENT OF GAS AND OIL RESERVOIR UNDERLAIN WITH WATER WITH HYDROCARBON PRODUCTION UNDER PRESSURE | 2020 |
|
RU2749229C1 |
METHOD TO DEVELOP OIL DEPOSIT WITH GAS CAP (VARIANTS) | 2006 |
|
RU2312983C1 |
DEVELOPMENT METHOD OF ULTRAVISCOUS OIL DEPOSIT WITH GAS CAP | 2018 |
|
RU2712904C1 |
METHOD OF OIL AND GAS CONDENSATE FIELD DEVELOPMENT (VERSIONS) | 2013 |
|
RU2530031C1 |
Authors
Dates
1997-10-27—Published
1987-06-08—Filed