FIELD: gas industry. SUBSTANCE: in proposed method injection wells uncovered by perforation below design level of gas-water contact surface should be arranged according to circular or segment scheme. In process of gas injecting, water bank formed around injection well is displaced by bed water to edge portions of storage where thickness of gas saturated formation is less than height of water bank. The latter will prevent spreading of gas over top of bed-reservoir. EFFECT: prevention of gas spreading over top of bed-reservoir. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CREATING UNDERGROUND GAS STORAGE IN WATER-BEARING GEOLOGIC STRUCTURE | 2015 |
|
RU2588500C1 |
METHOD FOR CREATING AN UNDERGROUND GAS STORAGE IN AN AQUIFER GEOLOGICAL STRUCTURE | 2021 |
|
RU2771966C1 |
METHOD FOR CREATION OF UNDERGROUND GAS STORAGE IN WATER-BEARING GEOLOGICAL STRUCTURE | 2017 |
|
RU2697798C2 |
METHOD FOR CREATING UNDERGROUND GAS STORAGE IN AQUIFER | 2016 |
|
RU2625831C1 |
METHOD OF UNDERGROUND GAS STORAGE OPERATION | 2019 |
|
RU2716673C1 |
METHOD FOR FORMING UNDERGROUND GAS-HOLDING STORAGE IN WATER-BEARING BED | 0 |
|
SU1041438A1 |
METHOD OF CREATING UNDERGROUND GAS STORAGE IN WATER-BEARING RESERVOIR | 2023 |
|
RU2818282C1 |
CREATION METHOD OF LOW-PREMEABILITY OF SCREEN IN POROUS MEDIUM | 2009 |
|
RU2386805C1 |
METHOD FOR CREATING AND OPERATING AN UNDERGROUND GAS STORAGE FACILITY IN AN AQUIFEROUS GEOLOGICAL STRUCTURE | 2021 |
|
RU2770028C1 |
METHOD OF EXPLOITATION OF SUBSURFACE STORAGE OF NATURAL GAS | 2015 |
|
RU2615198C1 |
Authors
Dates
1996-10-20—Published
1990-11-29—Filed