FIELD: transport infrastructure.
SUBSTANCE: invention relates to the field of subway construction, in particular to the construction of escalator complexes for the entrance to metro stations. The construction of the escalator cascade complex begins with the construction of a pit, the first layer of the lining of the escalator complex is concreted along the contour of the pit using the "wall in the ground" method, the soil is being developed and the second layer of the lining is concreted under its protection, a waterproofing layer is performed between the first layer of the lining and the second one, then fittings are installed, the formwork is mounted and the concrete of the second layer of the lining of the escalator complex is laid. Monolithic reinforced concrete structures of the tiers of the escalator cascade are concreted simultaneously with the walls of the second layer of the lining and perform the function of spacer plates in the structure of the escalator complex for permanent operation, concreting of the second layer of the lining is carried out, as a rule, from the bottom up, then escalator and elevator structures are mounted, these works are also performed from the bottom up.
EFFECT: exception in the construction of special trenchless methods of work using tunneling shields, an increase in the speed and maintainability of construction, a reduction in the daytime surface subsidence, an increase in the safety of construction and reliability of operation of the escalator complex.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF ESCALATOR TUNNEL CONSTRUCTED BY TUNNELLING IN WEAK WATERLOGGED SOILS | 2021 |
|
RU2768765C1 |
SUBWAY LINE IN DEEP URBAN AREAS | 2023 |
|
RU2808273C1 |
SUBWAY STATION AND METHOD OF ITS CONSTRUCTION (DEVICE AND METHOD NAMED AFTER YURKEVICH PB) | 2012 |
|
RU2505646C2 |
METHOD FOR ERECTING A THREE-SPAN METRO STATION WITH A DOUBLE-TRACK MIDDLE STATION TUNNEL AND SIDE STATION HALLS WITH PASSENGER PLATFORMS | 2022 |
|
RU2779168C1 |
SUBWAY STATION ERECTION METHOD (YURKEVICH(S METHOD) | 2014 |
|
RU2565314C2 |
METHOD FOR CONSTRUCTING A THREE-SPAN SUBWAY STATION OF AN OPEN METHOD OF PERFORMING WORKS WITH A LATERAL ARRANGEMENT OF PASSENGER PLATFORMS AND A DOUBLE-TRACK STILL TUNNEL | 2018 |
|
RU2692518C1 |
SHALLOW LYING SINGLE-VAULT METRO STATION, CONSTRUCTED BY A CLOSED METHOD FOR WORK, WITH A LINING MADE OF MONOLITHIC REINFORCED CONCRETE | 2021 |
|
RU2771803C1 |
SINGLE-VAULT DEEP UNDERGROUND STATION WITH SUPPORTING TUNNELS, CONSTRUCTED BY A CLOSED METHOD FOR WORK | 2022 |
|
RU2785300C1 |
SINGLE-VAULTED SUBWAY STATION ARRANGED IN DOUBLE-TRACK MAIN LINE TUNNEL | 2019 |
|
RU2701762C1 |
METHOD FOR CONSTRUCTING METRO STATION FROM PREFABRICATED ELEMENTS USING CLOSED METHOD OF PERFORMING WORK ON EXISTING METRO LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2815900C1 |
Authors
Dates
2022-03-16—Published
2021-06-23—Filed