FIELD: excavation of frozen ground, particular, sand. SUBSTANCE: ground area is heated, and trench is dug below the depth of frozen ground. Worked in non-frozen ground is adit and heat-transfer agent is supplied to adit, and defrosted ground is removed from the bottom upwards, thus forming adit. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO PREPARE PERMAFROST SOIL FOR DEVELOPMENT | 2010 |
|
RU2449089C1 |
METHOD OF MELTING OF FROZEN ROCKS AND SOIL | 2015 |
|
RU2602460C1 |
METHOD OF PREPARING DRAIN-TUBE LAYER TO WINTER OPERATION | 1998 |
|
RU2142036C1 |
CLEANING METHOD FOR BEDS OF MINOR RIVERS IN PERMAFROST ZONE TO REMOVE BOTTOM SEDIMENTS CONTAMINATED WITH RADIONUCLIDES | 2006 |
|
RU2331732C2 |
METHOD OF TESTING FROZEN SOIL WITH THERMOPRESSIOMETER | 0 |
|
SU775221A1 |
METHOD FOR THE DEVELOPMENT OF PERMAFROST ALLUVIAL DEPOSITS | 2022 |
|
RU2780054C1 |
METHOD OF COMBINATION DEVELOPMENT OF PERMAFROST SLIMES IN ACTIVE PIT | 2011 |
|
RU2486341C2 |
METHOD OF HYDRAULIC THAWING OF FROZEN ROCK | 0 |
|
SU863785A1 |
METHOD FOR ERECTING FOUNDATIONS IN WINTER | 1988 |
|
RU2043461C1 |
PROCESS OF DEVELOPMENT OF FROZEN GROUND BY SUCTION-TUBE DREDGE | 2001 |
|
RU2204658C2 |
Authors
Dates
1994-03-15—Published
1989-12-04—Filed