FIELD: hydraulic engineering and irrigation and drainage construction. SUBSTANCE: device includes interconnected casing panels 4 and 5 and means for their shifting. Casing panels are made for horizontal motion and are curved in plan. They are connected to each other by vertical walls 6 and 7 and horizontal braces 7 are articulated to panels so as to form two adjacent compartments, one of which, first, in direction of dam erection is of closed contour and comprised of vertical walls 6 and 7 and panels 4 and 5, and the other has one open side formed by horizontal braces 9. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF EARTH-AND-ROCKFILL DAM IN WATER | 1992 |
|
RU2033493C1 |
CONCRETE DAM | 1992 |
|
RU2038443C1 |
STONE-EARTH FILL DAM WITH FREEZING UPPER PART | 1993 |
|
RU2071524C1 |
METHOD OF MONITORING COMPACTION PERFORMANCE OF INHOMOGENEOUS CLAYEY EARTH | 1991 |
|
RU2010083C1 |
MATERIAL FOR CREATION OF ANTISEEPAGE ELEMENT OF EARTH WATER-DEVELOPMENT WORKS | 1991 |
|
RU2016161C1 |
METHOD OF BUILDING RECONSTRUCTION | 1995 |
|
RU2078885C1 |
METHOD OF DETERMINATION OF FILTRATION CHARACTERISTICS OF BEDROCK OF WATER-DEVELOPMENT WORKS | 1991 |
|
RU2021588C1 |
METHOD OF CONSTRUCTING A DAM OF LOCALLY AVAILABLE MATERIALS | 0 |
|
SU1296672A1 |
LOAD FIXING DEVICE | 1991 |
|
RU2009909C1 |
METHOD OF EARTH DAM CONSTRUCTION | 1998 |
|
RU2145372C1 |
Authors
Dates
1994-03-30—Published
1991-06-24—Filed